广东Construction general contracting for the renovation of Xinken sewage treatment station and supporting sewage pipeline network project

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Announcement of Qualification Review Results: The post qualification review of the Xinken Sewage Treatment Station Renovation and Supporting Sewage Pipe Network Engineering Construction General Contracting [Project No.: JG2025-1030] project has been completed. The qualification review results are now announced as follows: Number: Applicant Name: Qualification Review Results (Passed/Failed) Specific reasons: 1. Guangdong Haojia Construction Engineering Co., Ltd. did not pass the qualification review. Guangdong Haojia Construction Engineering Co., Ltd. did not submit a bidder's declaration, which does not comply with the qualification review qualification conditions stipulated in Article 2.1.1 of the pre attached table 2.1.1 of the bidding document evaluation method, which states that "the bidder's declaration must be signed or stamped by the legal representative, project leader, and technical leader, and stamped with the unit seal (signature and stamp requirements are specified in item 3.6.1 of the pre attached table of the" Instructions to Bidders "), Not passing the qualification review. 2. Guangdong Hecheng Environmental Engineering Co., Ltd. passed. 3. Guangdong Zhongshui Construction Engineering Co., Ltd. passed. 4. Shenzhen Kejian Construction Group Co., Ltd. passed. 5. China Railway 16th Bureau Group Co., Ltd. passed. 6. Guangdong Jinjuming Construction Engineering Co., Ltd. passed. 7. Guangzhou Tianxiang Construction Engineering Co., Ltd. passed. 8. Ronghong Construction Engineering Group Co., Ltd. passed. 9. Guangzhou Henglong Construction Engineering Co., Ltd. passed. 10. Guangdong Zhonghan Construction Co., Ltd. passed. 11. Guangdong Hengyu Construction Engineering Co., Ltd. passed. 12. Huajin Construction Group Co., Ltd. passed. 13. Chongqing Huangjin Construction (Group) Co., Ltd. passed. 14. Shenzhen Guodi Construction Engineering Co., Ltd. passed. The public notice period is from 23:59 on April 27, 2025 to 23:59 on April 30, 2025. If the bidder or other interested parties have objections to the qualification review results of the project, they shall submit them in writing to the tenderer during the period of publicizing the qualification review results. The tenderer shall provide a written response within 3 days from the date of receiving the objection. Prior to providing a response, the tendering and bidding activities shall be suspended. If dissatisfied with the bidder's objection response, the bidder may file a complaint with the bidding supervision department in accordance with Article 60 (1) of the Implementation Regulations of the Tendering and Bidding Law of the People's Republic of China by presenting the bidder's objection response and complaint letter. Objection acceptance department (tenderer): Guangzhou Nansha Industrial Construction Management Co., Ltd. Contact person: Zhou Gong Contact phone number: 020-8499865 Contact address: Complaint acceptance department (bidding supervision department): Housing and Urban Rural Development Bureau of Nansha District, Guangzhou City (government coordinated investment project) Contact phone number: 39053896 Contact address: 3rd floor, Building E, No. 1 Fenghuang Avenue, Nansha District, Guangzhou City Attachment: 1. Announcement of post qualification review results - New Reclamation Construction General Contracting (JG2025-1030). pdf 0 Qualification review report [including qualification review report (review)] - excluding expert names. pdf Tenderer: Guangzhou Nansha Industrial Construction Management Co., Ltd. April 27, 2025
View hidden content