吉林EPC Engineering General Contracting for the R&D Capability Enhancement Construction Project of FAW Foundry Co., Ltd

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

The EPC engineering general contracting of the R&D capability enhancement construction project of FAW Foundry Co., Ltd. [Information time: April 27, 2025] [Information source: Read times:] [I want to print] [Close] Countdown days, hours, minutes for registration. The bidding announcement for the EPC engineering general contracting of the R&D capability enhancement construction project of FAW Foundry Co., Ltd. Project number: 0736-ZB202505261. Bidding conditions: The R&D capability enhancement construction project of FAW Foundry Co., Ltd. has been approved for construction, with project code 2411-22104-02-217744. The bidder is FAW Foundry Co., Ltd., and the construction funds are self raised by the enterprise. The project investment ratio is 100%. The project has met the bidding conditions and is now open for bidding for the general contracting of the project. 2. Project Overview and Bidding Scope 2.1 Project Name: EPC Engineering General Contracting for the R&D Capability Enhancement Construction Project of FAW Casting Co., Ltd. 2.2 Project Overview: This design involves the demolition of the existing oil chemical warehouse within the original factory area and the construction of a new building: Verification Center. Repair of the 3D printing room in the original trial production center. The total construction area of the new building is approximately 3410.19 square meters. The auxiliary room area on the second floor of the building adopts a reinforced concrete frame structure, while the main factory area adopts a light steel structure. The building contains functions such as fatigue test bench and salt spray test. The building has two floors, with the first floor being 4.8m high and the second floor being 4.9m high; The total height of the building is 10.85m, with a span of less than 24 meters. 2.3 Scope of bidding: EPC engineering general contracting. This project is a turnkey project, including the engineering contracting of the entire process of project procedures, design, procurement, construction, acceptance, and warranty services for construction and installation engineering. 2.4 Construction location: Within the Axle Gear Park of Changchun Automobile Economic and Technological Development Zone, Jilin Province. The plot is located south of Yi Er Road, north of Bing Wu Road, west of Harmony Street, and east of the project site. 2.5 Planned construction period: After the project contract is signed, the warm and enclosed conditions will be met within 5 months, and all construction content will be completed within 11 months. 2.6 Quality Standards: The quality of construction drawing design and the qualification rate of design products are 100%, meeting the requirements of the "Regulations on the Depth of Compilation of Construction Engineering Design Documents". The quality of engineering material procurement meets the requirements of design drawings and relevant standards and specifications, and the qualification rate of equipment and materials is 100%. Construction quality standard: The project quality meets the national construction acceptance standard. 2.7 Section division: 1 section. 2.8 Maximum bidding price: 15.6352 million yuan (including tax). 3. Qualification Requirements for Bidders 3.1 Qualification Requirements: Bidders must possess both Class B or higher design qualifications in the construction industry (construction engineering) and Class III or higher qualifications for general contracting of construction engineering issued by the construction administrative department, and the construction unit must have a valid safety production license. Financial requirements: Bidders must have a sound financial system and maintain good financial conditions for three consecutive years in 2021, 2022, and 2023, without any losses. (The financial audit report audited by an accounting firm or auditing institution shall be used as the basis for evaluation. If the bidder's establishment time is later than the specified year, the financial statements since its establishment shall be provided.) (If bidding is conducted in a consortium, all parties of the consortium shall
View hidden content