湖北Anqi Bangtai New Factory Building Project New Finished Product Warehouse and Supporting Facilities Engineering General Contracting

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

1、 Bidding conditions The EPC of the new finished product warehouse and supporting facilities of Angel Bontai New Plant Project has been approved for construction with the Registration Certificate of fixed assets investment Project in Hubei Province (registration project code: 2503-420505-04-01-888642). The construction fund is self raised by the enterprise, the construction unit and the Tenderee are Hubei Angel Bontai Biotechnology Co., Ltd., and the bidding agency is Hubei Huayi Engineering Consulting Co., Ltd. We are now conducting a public tender for the general contracting of the project and selecting the general contractor. 2、 Overview of this bidding project: 1. Project name: Angel Bontai New Factory Building Project New Finished Product Warehouse and Supporting Facilities Engineering General Contracting 2. Construction scale: Angel Bontai New Factory Building Project New Finished Product Warehouse and Supporting Facilities Engineering General Contracting involves the construction of two individual warehouses and supporting facilities with a building area of approximately 3505 square meters, including a finished product warehouse area of 3355 square meters and a building area of 3300 square meters (including a canopy area of 665 square meters), with a steel structure; The chemical reagent warehouse covers an area of 205 square meters, with a building area of 205 square meters and a concrete frame structure. Including outdoor walls, roads, unloading areas, pipelines, streetlights, greenery, and other supporting facilities. 3. Project construction location: Biotechnology Industrial Park 4, Xiaoting District, Yichang City. Bidding scope: This project adopts the engineering general contracting mode for construction, and the engineering general contracting scope includes all the following construction contents, including design, procurement, construction, completion acceptance, filing, handover, cooperation to complete the final settlement, engineering warranty and other stages of implementation and management, completion drawing coordination, and overall responsibility for the quality, safety, construction period and cost of the project. This bidding does not include air conditioning and air conditioning ducts, monitoring videos, and power cables from the enzyme preparation power workshop to the finished product warehouse distribution room. Among them: (1) Design scope: Conduct preliminary design (including detailed design) and construction drawing design (excluding process design) within the scope of all projects to meet construction requirements. At the same time, deepen the design scheme to control project investment while fully meeting the requirements of the employer, until the employer's control objectives are met. Including but not limited to preliminary design (including detailed design), construction drawing design (excluding process design), planning drawings and building schemes required for handling relevant procedures, safety design sections and expert reviews, occupational disease prevention facility design sections and expert reviews, on-site services, coordination during construction and acceptance processes, scheme deepening and design changes during the construction process, etc. (2) Construction scope: Responsible for construction, acceptance, and quality warranty services during the warranty period for all project contents within the scope specified in the bidding documents and contract, as well as the construction drawings confirmed by the employer. Including but not limited to: building, structure, decoration, electrical lighting engineering, fire protection engineering, water supply and drainage engineering, etc. within the scope of construction drawings, outdoor and related supporting engineering (including roads, outdoor water supply and drainage, lighting, fences, greening, approximately 38000 cubic meters of earthwork excavation and 10000 cubic meters of filling, approximately 10000 square meters of roadbed dynamic compaction treatment, etc.), completion drawing, and defect repair engineering after completion. 5. Funding source: self raised by the enterprise. 6. Performance deadline: Total construction period of 180
View hidden content