广东Tender Notice for Survey and Preliminary Design of AT0206023 Plot (i.e. Plot 1) of Yuangang Village Urban Village Renovation Project in Tianhe District [Electronic Bid]
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
Tender Notice for Survey and Preliminary Design of AT0206023 Plot (i.e. Plot 1) for Yuangang Village Urban Village Renovation Project in Tianhe District [Electronic Bid] Investment Project Code 2406-440106-04-01-875791 Investment Project Name: Tianhe District Yuangang Village Urban Village Renovation Project Tender Project Name: Tianhe District Yuangang Village Urban Village Renovation Project AT0206023 Plot (i.e. Plot 1) Survey and Preliminary Design Section (Package) Name: Tianhe District Yuangang Village Urban Village Renovation Project AT0206023 Plot (i.e. Plot 1) Survey and Preliminary Design Notice Nature: Normal Qualification Review Method: Post Qualification Review Tender Project Implementation (Delivery) Location: Yuangang Village, Yuangang Street, Tianhe District, Guangzhou City, East of Tianyuan Road, West of Tianyuan Road Near Yuangang North Road. The source of funds is state-owned or collective investment, which constitutes 100.00% of the bidding scope and scale of state-owned or collective investment. The total land area of the project plot is 18429.15 square meters, including 14878.48 square meters of available construction land and 3550.67 square meters of road land. The land use of AT0206023 plot is classified as Class II residential land (R2), with a plot ratio of ≤ 4.2, a calculated plot ratio building area of ≤ 62490 square meters, a building density of ≤ 28%, a green space ratio of ≥ 35%, a building height limit of 100m, and a building height that meets the clearance control requirements of Cencun Airport. (The final approval of the plan shall prevail). The specific requirements for supporting public services and municipal transportation facilities are as follows: 1 community health service center, 1 property management building, 1 basic business premises, 1 mass sports venue, and storage facilities; The maximum building height is about 100m, and the foundation design grade is Class A. The final decision shall be based on the formal planning conditions and approval requirements. The bidding content includes engineering survey within the land (including preliminary survey, detailed survey stage and advance drilling (to be confirmed by the tenderer according to the actual situation of the project after winning the bid), scheme design and preliminary design stage design, BIM forward design, and the design depth needs to meet the requirements of the government's competent department for preliminary design approval depth, including geotechnical engineering, geological exploration, foundation pit support design, foundation and soft foundation treatment design, construction detailed planning and design, building scheme design, preliminary design, budget preparation (including scheme design estimation and preliminary design budget), corresponding design work caused by policy changes or corresponding external condition changes, and design work related to the survey, scheme design and preliminary design stages of this project. For specific details, please refer to the "Survey and Design Contract" and the "Survey and Preliminary Design Task Book". The construction period (delivery time) can be found in the bidding announcement and bidding documents. The maximum bidding price (in 10000 yuan) is 646.97. Whether to accept consortium bidding is a requirement for bidding qualification ability. The bidder's qualification requirement is: 3.1 The bidder (if it is a consortium, all parties of the consortium) has no contract performance disputes with the tenderer in the past 3 years, and there is no situation where they are not allowed to participate in bidding. [Note] Contract performance dispute refers to the situation where the tenderer has signed a contract with a bidder within the past 3 years and is dissatisfied with the bidder. The situations where bidders are not allowed to participate in bidding are detailed in Article 1.4.3 of Chapter 2 of the bidding documents. 3.2 Bidders must simultaneously