广东Tender Notice for Construction Supervision Services of AT0206023 Plot (i.e. Plot 1) of Yuangang Village Urban Village Renovation Project in Tianhe District [Electronic Bid]

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Bidding Notice for Construction Supervision Services of AT0206023 Plot (i.e. Plot 1) for Yuangang Village Urban Village Renovation Project in Tianhe District [Electronic Bid] Investment Project Code 2406-440106-04-01-875791 Investment Project Name: Tianhe District Yuangang Village Urban Village Renovation Project Bidding Project Name: Tianhe District Yuangang Village Urban Village Renovation Project AT0206023 Plot (i.e. Plot 1) Construction Supervision Services Section (Package) Name: Tianhe District Yuangang Village Urban Village Renovation Project AT0206023 Plot (i.e. Plot 1) Construction Supervision Services Announcement Nature: Normal Qualification Review Method: Qualification Post Review Bidding Project Implementation (Delivery) Location: AT0206023 Shoukai District, Yuangang Village, Tianhe District, Guangzhou City The funding source of the plot is state-owned or collective investment. The funding source constitutes 100.00% of the bidding scope and scale of state-owned or collective investment. The construction scale of the project site is 18429.15 square meters, including 14878.48 square meters of available construction land and 3550.67 square meters of road land. The calculated plot ratio building area is about 62490 square meters, and the highest building height is not more than 100 meters. The supervision work includes but is not limited to the following: quality control, occupational health and safety, and environmental supervision and management (including epidemic prevention and control), investment control, progress control, contract management, information management for all engineering contents within the scope of project initiation (including feasibility study), including but not limited to the following: engineering survey and design stage, construction preparation stage, construction stage, engineering closure stage (including but not limited to completion acceptance, rectification, engineering handover, engineering settlement, etc.), and engineering quality warranty stage (including defect liability period, the same below) BIM whole process, organization and coordination, safe and civilized construction, green construction management, engineering excellence, engineering changes, equipment supervision, on-site supervision, land acquisition and demolition, pipeline relocation, greening relocation, coordination of the working relationship between the construction unit and relevant parties of the project construction. The supervisor must also enter the site in advance as required by the client to participate in the preparation and planning work in the early stage of the design, assist the client in formulating engineering management methods, engineering excellence methods, project management planning, responsibilities of each participating party, and related administrative work. The specific scope of supervision shall be subject to the entrusted implementation. The supervision work of the bidding content includes but is not limited to the supervision of all engineering contents within the scope of project initiation (including feasibility study) (excluding monetary compensation for power supply), specifically including but not limited to the following: quality control, occupational health and safety and environmental supervision and management (including epidemic prevention and control), investment control, progress control, contract management, information management BIM whole process, organization and coordination, safe and civilized construction, green construction management, engineering excellence, engineering changes, equipment supervision, on-site supervision, land acquisition and demolition, pipeline relocation, greening relocation, coordination of the working relationship between the construction unit and relevant parties of the project construction. The supervisor also needs to
View hidden content