北京Construction Project for Enhancing Resin and Component Production Capacity (EPC)
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
F0SG202500223 [Project Number: F0SG202500223] Resin and Component Production Capacity Enhancement Construction Project (EPC) Construction Bidding Announcement 1. Bidding Conditions: The resin and component production capacity enhancement construction project (EPC) of this project has been approved for construction by AVIC Aviation High tech Co., Ltd. under AVIC Science and Technology [2025] No. 12. The tenderer (project owner) is AVIC Composite Materials Co., Ltd. The construction funds are self raised by state-owned enterprise units (central), and the project investment ratio is 100%. The project has met the bidding conditions. Now, the construction of this project is open for bidding. 2. Project Overview and Bidding Scope 2.1 Construction Site of the Project: No. 16 Mintai Road 2.2 Construction Scale of the Project: The renovated building area is 10600 square meters, including 10600 square meters of above ground building area and 0 square meters of underground building area. The building has 1 floor above ground and 0 floor underground, with a height of 12.2 meters and a span of 30.5 meters. The estimated contract price is 4067.13 million yuan. The construction period of this project is required to be 206 calendar days. The bidding scope of this project is based on the standards, specifications, functions, scale, and completion date agreed upon by the tenderer. The preliminary design, construction drawing design, engineering construction, material and equipment procurement, joint debugging and testing, completion acceptance, completion filing, and delivery for use of this project will be completed, and any defects and quality problems will be repaired during the warranty period by the EPC contractor. 2.5 Other maximum spans are approximately 30.5 meters. 3. Qualification Requirements for Bidders 3.1 The bidding for this project requires bidders to have a second level [new] or higher qualification for general contracting of construction projects and a first level or higher qualification for engineering design in the construction industry (construction projects). Bidders must have the following performance requirements in the past 5 years: a. Design performance requirements: have completed housing construction project design performance with an investment amount of 30 million yuan or more or a building area of 8000 square meters or more, or have completed housing construction project EPC engineering general contracting performance (investment amount refers to construction and installation fees or design budget); b. Construction performance requirements:/. (Similar project description in recent years) Performance, and corresponding construction capabilities in personnel, equipment, funds, etc. Among them, the bidder's proposed project manager must have the first level registered construction engineer qualification for construction engineering, possess a valid safety production assessment certificate (B version), and shall not serve as a project manager for other ongoing construction projects when determining the winning bidder. 3.2 The bidding for this project accepts consortium bidding. For consortium bidding, the following requirements must be met: (1) Each party of the consortium must sign a consortium agreement in the format provided in the bidding documents, clarifying the rights and obligations of the consortium leader and each party; (2) Each party of the consortium shall not participate in the qualification review separately or join other consortia in the same section in their own name. 3.3 Other requirements: 1. For consortium bidding, the following requirements must be met: (1) Both parties of the consortium must sign a consortium agreement, which clarifies the rights and obligations of the consortium leader and both parties; (2) Each party of the consortium shall not independently or join any other consortium in their own name