安徽Announcement not yet started: Procurement and installation of equipment for sludge and drainage tanks at Hefei Water Group's Seventh Water Plant (secondary)

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Untitled Document: Procurement and Installation (Secondary) of Sludge and Drainage Tank Equipment for Hefei Water Group's Seventh Water Plant 1. Bidding Conditions 1.1 Project Name: Procurement and Installation (Secondary) of Sludge and Drainage Tank Equipment for Hefei Water Group's Seventh Water Plant 1.2 Project Approval, Approval or Filing Authority Name:/. 1.3 Approval Name and Number:/. 1.4 Bidder: Hefei Water Group Co., Ltd. 1.5 Project Owner: Hefei Water Group Co., Ltd. 1.6 Source of Funds: Self raised 1.7 Project Contribution Ratio: 100% 1.8 Fund Implementation Status: Implemented 2. Project Overview and Bidding Scope 2.1 Bidding Project Name: Procurement and Installation of Sludge and Drainage Tank Equipment for Hefei Water Group's Seventh Water Plant (Secondary) 2.2 Bidding Project Number: 2025BFFWZ009612.3 Section Division: This bidding project is divided into one section. 2.4 Tender Project Section Number: 2025BFFWZ009612.5 Tender Project Location: Hefei City, designated by the tenderer 2.6 Tender Project Scale: The seventh water plant of Hefei Water Group has a water supply capacity of 400000 cubic meters per day, and the sludge and drainage tanks are currently being renovated. The renovation project includes dredging the sludge and drainage tanks, repairing the surrounding tank walls, redoing the cable trays around the tank body, and covering the entire tank body. The overall span of the sludge tank exceeds 23 meters, and the depth of the sludge tank exceeds 7 meters. Please refer to the bidding documents for details. 2.7 Estimated Contract Price: 1.36 million yuan 2.8 Delivery Time: Within 90 calendar days after the contract is signed, the equipment supply and installation, operation and commissioning, decoration and construction shall be completed and accepted by the tenderer. 2.9 Delivery location: Hefei City, designated location by the tenderer 2.10 Bidding scope: The seventh water plant of Hefei Water Group has a water supply capacity of 400000 cubic meters per day, and the sludge and drainage tanks are currently being renovated. The renovation project includes dredging the sludge and drainage tanks, repairing the surrounding tank walls, redoing the cable trays around the tank body, and covering the entire tank body. The overall span of the sludge tank exceeds 23 meters, and the depth of the sludge tank exceeds 7 meters. Please refer to the bidding documents for details. 2.11 Project Category: Goods unrelated to the project 2.12 Others:/. 3. Qualification Requirements for Bidders 3.1 Bidders shall be legally established and meet the following conditions to undertake this bidding project: 3.1.1 Qualification Requirements for Bidders:/. 3.1.2 Performance requirements for bidders: Since January 1, 2020 (based on the date of contract signing), bidders must have a supply or installation performance of water supply engineering equipment with a total contract amount of no less than 600000 yuan. 3.1.3 Financial requirements:/. 3.1.4 Credit requirement: The bidder has not been recorded with any misconduct by the public resource trading supervision and management departments of Hefei City and its subordinate counties (cities) and districts (development zones); Or being recorded as having engaged in misconduct (based on the date of publication), but also meeting the following conditions: (1) accumulating less than 10 points within 6 months before (including) the bid opening date; (2) If the accumulated score within 12 months before (including) the bid opening date is less than 15 points; (3) Within 18 months prior to the bid opening date (including the same day), if the cumulative score is less than 20 points; (4) Before the bid opening date(
View hidden content