广东Tender Notice for Design and Construction General Contracting of Zengcheng New Materials Industrial Park Project (5th Floor Chinese style Experimental Workshop and 6th Floor B Area Laboratory Renovation)

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Design and Construction General Contracting Tender Announcement for Zengcheng New Materials Industrial Park Project (Decoration and Renovation of Chinese style Experimental Workshop on the 5th Floor and Laboratory in Zone B on the 6th Floor) [Electronic Bid] Investment Project Code/Investment Project Name/Tender Project Name Zengcheng New Materials Industrial Park Project (Decoration and Renovation of Chinese style Experimental Workshop on the 5th Floor and Laboratory in Zone B on the 6th Floor) Renovation and renovation project for approximately 1000 square meters of laboratory in Zone B on the 6th floor. Tender content 2.6.2.1 Engineering design and related work, including but not limited to: scheme design, preliminary design, construction drawing design, and construction coordination services, etc. The specific requirements notified by the tenderer shall prevail. 2.6.2.2 The implementation phase of the project includes but is not limited to: in accordance with the scope stipulated in the bidding documents and contracts, including but not limited to labor, materials, equipment, quality, safety production, civilized construction, construction period, acceptance of the project within the scope of the contract, handover, data organization, professional coordination and cooperation, warranty, ensuring that all work is completed on time and with quality, and passing the completion acceptance record of the relevant competent department. 2.6.2.4 Conduct limit design and construction according to the requirements of the tenderer, design task book, and other data requirements. 2.6.2.5 The organizer of the consortium shall comprehensively coordinate and manage the design, construction progress, quality, safety, investment control, and management of this bidding project. Construction period (delivery time) 120 Maximum bidding price (10000 yuan) 1080 Whether to accept consortium bidding is a requirement for bidding qualification and ability. Bidder qualification requirements: 3.1 This bidding requires bidders to have the following qualifications: 3.1.2 Engineering design qualification: Bidders should have a comprehensive Class A qualification for engineering design issued by the construction administrative department within the validity period, or a Class C qualification for the construction industry, or a Class C qualification for the construction industry (construction engineering) profession, or a qualification for architectural design firms; Hong Kong enterprises participating in bidding independently must register with the housing and urban-rural development department of Guangdong Province, and the registered business scope should meet the requirements of engineering design qualifications for this bidding project. Foreign or Macau/Taiwan design companies participating in bidding must choose a company that meets the above qualification requirements for collaborative design. If Hong Kong enterprises do not participate in bidding separately for the design party, they must also choose a company that meets the above qualification requirements for collaborative design. 3.1.3 Construction Qualification: Bidders shall have a Level 2 (or above) qualification for professional contracting of building decoration and renovation projects or a Level 3 (or above) qualification for general contracting of building construction projects issued by the competent construction administrative department within the validity period, and shall have a Safety Production License issued by the competent construction administrative department within the validity period. 3.2 This tender accepts consortium bidding. For consortium bidding, the following requirements should be met
View hidden content