广东Advanced Manufacturing Industrial Park A1 Plot Divided into Plot Five Construction Projects - Tender Announcement for Survey, Design, Construction, General Contracting and Operation Projects of Plot Five and Six Construction Projects in Advanced Manufacturing Industrial Park A1 Plot

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Bidding Announcement for Survey, Design, Construction, General Contracting, and Operation Projects of Plot A1 of Advanced Manufacturing Industrial Park, divided into Plot 5 and Plot 6 [Electronic Bid] Investment Project Code 2302-440114-04-01-713058; 2302-440114-04-01-999672 Investment project name Advanced Manufacturing Industrial Park A1 plot divided into five construction projects; The bidding project name for the construction project of the advanced manufacturing industrial park A1 plot divided into six plots is Advanced Manufacturing Industrial Park A1 plot divided into five and six construction projects, survey, design, construction general contracting and operation project section (package) name Advanced Manufacturing Industrial Park A1 plot divided into five and six construction projects, survey, design, construction general contracting and operation project announcement nature, normal qualification review method, qualification review, bidding project implementation (delivery) location, north of Yanjiang Avenue and east of Hejin Avenue in Tanbu Town, Huadu District, Guangzhou City. The source of funds is state-owned or collective investment. The scope and scale of the bidding are 100.00% state-owned or collective investment. The land for this project is located north of Yanjiang Avenue and east of Hejin Avenue in Huadu District, Guangzhou City. There are two plots in total, namely: Plot Five: with a total land area of approximately 65460.54 square meters (including 58317.08 square meters for construction and 7143.46 square meters for green space), a plot ratio of 2.0-4.0, a building density of ≥ 30%, and a green space ratio of ≤ 20%; Plot 6: The total land area is approximately 63248.64 square meters (including 58317.06 square meters for construction and 4931.58 square meters for green space), with a plot ratio of 2.0-4.0, a building density of ≥ 30%, and a green space ratio of ≤ 20%; Plot 5: The total land area is approximately 65460.54 square meters (including 58317.08 square meters for construction and 7143.46 square meters for green space). A total of 24 individual buildings and 1 basement will be constructed. Including: Building A-3; Building 6 of C-type factory building; C-1 type factory building 6; C-2 type factory building 6; Building 1 of D-type factory building; Building 1 of D-1 type factory building; D-2 type factory building 1; Building 1 of E-type factory building; 1 # Dormitory Building 1, including underground garage and equipment room; The total construction area is 162033.10 square meters, including: above ground construction area: 158150.00 square meters, underground construction area: 3883.10 square meters; The calculated building area is 155650.00 square meters, the building base area is 27846.00 square meters, the plot ratio is 2.67, the building density is 47.75%, and the green space ratio is 10.02%. There are 486 parking spaces for motor vehicles and 242 parking spaces for non motor vehicles. Plot 5, with a maximum of 1 underground floor and 19 above ground floors, a maximum span of 11.5 meters, a maximum single building area of approximately 20000 square meters, a maximum single building height of approximately 67.15 meters, a building structure design safety level of level 2, and a foundation design level of level B. Plot 6: The total land area is approximately 63248.64 square meters (including 58317.06 square meters for construction and 4931.58 square meters for green space). Construct a total of 17 individual buildings, underground
View hidden content