广东Yangjiang City Jiangcheng District Shuangjie Town Rural Water System Comprehensive Improvement Project Survey and Design
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
Survey and Design of Rural Water System Comprehensive Improvement Project in Shuangjie Town, Jiangcheng District, Yangjiang City [Electronic Bid] Investment Project Code: 2502-441702-01-01-982498 Investment Project Name: Yangjiang City, Jiangcheng District, Shuangjie Town, Rural Water System Comprehensive Improvement Project Bidding Project Name: Yangjiang City, Jiangcheng District, Shuangjie Town, Rural Water System Comprehensive Improvement Project Survey and Design Section (Package) Name: Yangjiang City, Jiangcheng District, Shuangjie Town, Rural Water System Comprehensive Improvement Project Survey and Design Announcement Nature: Normal Qualification Review Method, Qualification Review, Bidding Project Implementation (Delivery) Location: Shuangjie Town, Jiangcheng District, Yangjiang City Funding Source: Superior Special Funds (including Bonds), the shortfall will be resolved by the district level finance department, and the shortfall will be covered by the superior special funds (including bonds). The district level finance department will coordinate and solve the bidding scope and scale management of 15 river channels and 81 management channels Governance of 27 mountain ponds (including ponds), construction of 18 pumping stations, construction of 49 water basins, construction of 4 water gates, and construction of 5 ecological landscape nodes. The bidding content includes the survey of the project (geological survey and topographic survey), preliminary design (including report, estimate, and attached drawings), construction drawing design, service work that can meet the requirements of the district's financial review, completion acceptance, and other stages, and the submission of corresponding survey and design documents and relevant technical information. Construction period (delivery time) Survey and design period: The total construction period is 90 calendar days. The maximum bidding price (in 10000 yuan) is 800 yuan. Whether to accept consortium bidding is a requirement for bidding qualification and ability. The bidder's qualification requirements are: 1. The bidder must be registered within the territory of the People's Republic of China and have independent legal personality; 2. Bidders must meet the following (1) and (2) qualification conditions: (1) Engineering design: possess one of the following conditions: ① Comprehensive Class A qualification for engineering design; ② Grade C (or above) qualification for engineering design in the water conservancy industry; (2) Engineering survey: meet one of the following conditions: ① Class A comprehensive engineering survey; ② Class C (or above) qualification for geotechnical engineering survey in the field of engineering survey, and Class B (or above) qualification for engineering surveying in the field of engineering survey; ③ Qualification of Class C (or above) in geotechnical engineering survey and Class B (or above) in surveying and mapping (engineering surveying). 3. The project leader who intends to invest in this project must hold the title of intermediate (or above) engineer in the field of water conservancy and hydropower engineering; 4. This project accepts participation in bidding in the form of a consortium. For consortium bidding, the following requirements must be met: the total number of consortium members shall not exceed 2 (including the leading party of the consortium, which is the design unit). All parties to the consortium must sign a consortium agreement. After signing the consortium agreement, all parties of the consortium shall not bid separately in their own name, nor shall they form or participate in other consortia to bid in the same project; The leading party of the consortium is responsible for the hosting and coordination of the bidding and contract implementation stages on behalf of all members of the consortium. However, other members of the consortium still bear joint and several legal responsibilities during the bidding, signing, and performance of the contract. Qualification requirements for project leader: intermediate (or above) engineer title in water conservancy and hydropower engineering. Performance requirements for bidders: no performance requirements. Other requirements: Whether to use electronic bidding method is to obtain