吉林Erosion Gully Treatment Project in Hadashan Project Area of Songyuan City in 2025
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
Tender Announcement for Erosion Gully Treatment Project in Hadashan Project Area of Songyuan City in 2025 Project No.: SYS20250423SLGC010011、 The bidding conditions for the erosion ditch treatment project in the Hadashan project area of Songyuan City in 2025 have been approved for construction by the Jilin Provincial Department of Water Resources under the document Jishuibao (2025) No. 48, with construction funds from central water resources development funds, provincial supporting funds, and local supporting funds. The bidder is the Comprehensive Service Center of Hadashan Town, Ningjiang District, Songyuan City (Grassroots Governance Service Center of Hadashan Town, Ningjiang District, Songyuan City), and the bidding agency is Zhongkai Project Management Consulting Co., Ltd. The project has met the bidding conditions and is now open for bidding. 2. Project Overview and Bidding Scope 2.1 Project Overview: Erosion Gully Treatment Project in Hadashan Project Area of Songyuan City in 2025; 2.2 Bidding Scope: All contents included in the bill of quantities and drawings; 2.3 Construction site: Hadashan project area; 2.4 Planned construction period: from the date of contract signing to June 30, 2025; 2.5 Engineering Quality Requirements: Qualified projects that comply with the standards of "Inspection and Evaluation Regulations for Construction Quality of Water Resources and Hydropower Engineering" (SL176-2007), "Acceptance Regulations for Water Resources and Hydropower Construction Engineering" (SL223-2008), and "Acceptance Regulations for Hydrological Facility Engineering" (SL650-2014). 3. Qualification Requirements for Bidders 3.1 This bidding requires bidders to possess: (1) independent legal personality; (2) Enterprise legal entity with a qualification of second level or above (including second level) for general contracting of water conservancy and hydropower engineering construction; (Note: The bidding for the third level qualification of general contracting for water conservancy and hydropower engineering construction within the validity period is valid and shall be executed in accordance with the documents of the local construction administrative department. The bidding documents must provide screenshots and website addresses of the official website of the local housing and urban-rural development department, otherwise it will not be recognized.) 3.2 This bidding does not accept consortium bidding. 4. 4.1 Acquisition of Bidding Documents 4.1 Interested bidders are requested to visit the Jilin Province Public Resource Trading Integrated Platform from 8:00 am on April 29, 2025 to 4:00 pm on May 8, 2025 https://www.ggzyyth.jl.cn/EpointSSO/memberLogin Jilin Province Water Conservancy Construction Information Platform http://sl.jlssljsxx.com:8003/ Download the bidding documents from both websites. 4.2. Bidders who have not registered and obtained CA locks in the Jilin Province Public Resource Trading Integrated Platform trading system should refer to the "Jilin Province Public Resource Trading Integrated Platform Operation Manual" for details, please refer to the Jilin Province Public Resource Trading Network( http://www.ggzyzx.jl.gov.cn/ home page 4.3. The questioning, clarification, modification, and supplementation of the bidding documents for this project can be found on the "Jilin Province Public Resource Trading Integrated Platform"( https://www.ggzyyth.jl.cn/EpointSSO/memberLogin )Jilin Province Water Conservancy Construction Information Platform (h