北京Tender Announcement for Procurement of C02 Low Temperature Air Source Heat Pump Unit, Makeup Pump, and Circulating Water Pump for Jinkong Electric Railway Special Line Project
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
Tender Notice for Procurement of C02 Low Temperature Air Source Heat Pump Unit, Makeup Pump, and Circulating Water Pump for Jinkong Electric Railway Special Line Project (Tender No.: ZYGS-202512-ZB01) 1. Tender Conditions: This tender project is for the procurement of C02 Low Temperature Air Source Heat Pump Unit, Makeup Pump, and Circulating Water Pump for Jinkong Electric Railway Special Line Project. The tenderer is the Fifth Branch of Tonghao (Zhengzhou) Electrification Bureau Group Co., Ltd. The funds for the tender project have been secured. The project has met the bidding conditions and is now open for bidding for this procurement project. 2. Project Overview and Bidding Scope Project Overview: Procurement of CO2 Low Temperature Air Source Heat Pump Unit, Makeup Pump, and Circulating Water Pump for Jinkong Electric Railway Special Line Project. Scope of bidding: Please refer to the list of material requirements for details. Delivery location: Please refer to the list of material requirements for details. Delivery Time: Please refer to the Material Requirements List for details. 3. Qualification Requirements for Bidders 3.1 Qualification Requirements for Bidders in This Bidding: 3.1.1 Qualification Requirements: Bidders must be registered in accordance with the law within the territory of the People's Republic of China, have independent legal person qualifications, possess valid business licenses or institutional legal person certificates, have general taxpayer qualifications for value-added tax, possess third level or above qualifications for general contracting of mechanical and electrical engineering construction, and provide relevant supporting documents. 3.1.2 Financial Requirements: Bidders must have a good financial condition and provide financial accounting statements for the years 2022 to 2023 (if the bidder's establishment time is less than the specified year, financial accounting statements since its establishment should be provided). The paid in capital must not be zero. If there is a change in the paid in capital during this financial year, relevant supporting documents must be provided. 3.1.3 Performance Requirements: Bidders must have a supply performance of similar bidding equipment from 2023 to the present, and must provide a copy of the supply contract (including project name, contract list (prices can be hidden), and stamped pages of all parties to the contract). 3.1.4 Credit requirement: The bidder or bidding product has not been punished by the state, industry, China Railway Group Co., Ltd., or China Railway Signal&Communication Co., Ltd., and the bidder has not obtained the bid through fraudulent means or has no record of serious violations of laws and regulations or major quality problems in business activities in the past three years (2022 to present); The bidder and the legal representative (unit leader) of the bidder have no record of bribery crimes in the past three years; The bidder and the legal representative of the bidder have not been listed as dishonest persons subject to enforcement; Bidders who provide false or untrue response documents will be deemed invalid and will bear corresponding legal responsibilities. 3.1.5 Other requirements: Bidders must provide product quality inspection reports issued by the National Railway Product Supervision, Inspection and Certification Center, the former Product Quality Supervision and Inspection Center of the Ministry of Railways, or testing institutions certified by CAL, CNAS, CMA, etc; The relevant documents and certificates must be within their validity period; This tender does not accept bids from agents; Subcontracting or subcontracting is not allowed after winning the bid. 3.2 Bidders shall not have any of the following situations: (1) being ordered to suspend production or business, temporarily suspend or revoke licenses, temporarily suspend or revoke permits, or revoke qualification certificates; (2) Entering into liquidation proceedings, being declared bankrupt, or other situations of loss of contractual capacity; (3) The unit leader is the same