山西Procurement Announcement for Supervision of the Construction Project of the Linjin to Yongji Section of the Yellow River No.1 Tourist Highway in Yongji City

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Announcement release time: May 5, 2025 23:59:18 Project Overview: Potential suppliers for the supervision and procurement project of the construction of the Linjin to Yongji section of the Yellow River No.1 Tourist Highway in Yongji City should obtain the procurement documents online on the government procurement cloud platform and submit them before 09:00 on May 16, 2025 (Beijing time). 1、 Project Overview Project Number: 1408812025CCS00031 Project Name: Construction Project of the Linjin to Yongji Section of the Yellow River No.1 Tourist Highway in Yongji City Supervision and Procurement Method: Competitive Negotiation Budget Amount (yuan): 414614.81 Maximum Price Limit (yuan): 414614.81 Procurement Requirement: Bid Name: Procurement Package 1 Quantity: Budget Amount (yuan): 414614.81 Unit: Brief Specification Description: The construction project of the Linjin to Yongji section of the Yellow River No.1 Tourist Highway in Yongji City starts at the junction of Yongji City and Linyi County, with a starting point of K5+179. The route travels south through Changning Village, Changqing Village, Wangdong Village, and Kaobai Village. The village crosses the 3-18 main canal at K17+617, passes through Gaoshi Bridge, continues southward through Zhaoxing Village, and ends at the level crossing of Zhaoxing Toll Station on Yunfeng Expressway, with the terminal station at K19+821. The total length of the route is 14.642km. The technical standard of second-class highway is adopted, the design speed is 80km/h, the pavement is of asphalt concrete structure, and the design vehicle load level is Highway-I. The entire roadbed is 14.0m wide and the road surface is 11.5m wide; The cross-sectional form of the entire section is: soil shoulder 1.0m+flat edge stone 0.25m+hard shoulder 2.00m+carriageway 2 × 3.75m+hard shoulder 2.00m+flat edge stone 0.25m+soil shoulder 1.0m. Add asphalt pavement to an existing bridge. The central pile number of the bridge is K17+617, the bridge length is 53m, and the bridge deck width is 11m. Dismantle and rebuild 8 severely damaged culverts. The remaining 17 culverts will only undergo dredging treatment. The specific quotation scope, procurement scope, and specific requirements to be met for the supervision of this project shall be subject to the corresponding provisions on business, technology, and services in the negotiation documents. Note: Contract performance period: Package 1, same as the total construction period and defect liability period. This project (or not) accepts consortium bidding. 2、 Qualification requirements for applicants: 1. Meet the provisions of Article 22 of the Government Procurement Law of the People's Republic of China; 2. Qualification requirements for implementing government procurement policies: Package 1: This project is specifically aimed at small and medium-sized enterprises. This project is specifically aimed at bidding for small and medium-sized enterprises. Bidders must accurately classify their enterprise types according to the classification standards specified in the "Notice on Issuing the Classification Standards for Small and Medium sized Enterprises" (MIIT Joint Enterprise [2011] No. 300) issued by the Ministry of Industry and Information Technology, National Bureau of Statistics, National Development and Reform Commission, and Ministry of Finance. Prison enterprises and welfare units for people with disabilities are considered as small and medium-sized enterprises. 3. Specific qualification requirements for this project: [Package 1] 3.1 Possess a valid Class B highway engineering supervision qualification issued by the transportation authority, and have corresponding abilities in personnel, equipment, funds, and other aspects. 3.2 Qualification requirements for the proposed Chief Supervising Engineer of the project: having a senior engineer in the field of engineering
View hidden content