江苏Tender for Survey and Design Service Framework of Engineering Construction Project for No. 63 Student Dormitory Construction Project at Changshan Campus of Jiangsu University of Science and Technology, Zhenjiang University Investment and Construction Development (Group) Co., Ltd. for 2025-2026
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
The bidding announcement for the survey and design service framework of engineering construction projects of Zhenjiang University Investment and Construction Development (Group) Co., Ltd. for 2025-2026 (post qualification review) has been approved for implementation. The funding required for the project is self raised and has been implemented. Qualified potential bidders are now invited to participate in the bidding process for this project. Jiangsu Huicheng Investment Consulting Management Co., Ltd. is entrusted by the tenderer to be specifically responsible for the bidding matters of this project. 2、 Project Overview 1. Project Location: Zhenjiang City 2. Project Scale: Surveying, survey, and design services for engineering projects (including housing construction and municipal infrastructure) invested and constructed by Zhenjiang University Investment and Construction Development (Group) Co., Ltd. in 2025-2026, including Changshan Industry Education Integration Development Zone and the old campus managed and operated by the university group. 3. Construction period requirements: According to the scale of each individual project and the requirements of the tenderer, design personnel should be arranged reasonably to complete the design tasks in a timely manner and provide satisfactory services. 4. Quality standards: The quality standards comply with the current construction specifications and standards of the People's Republic of China, and strictly implement the "Regulations on Quality Management of Construction Projects", "Regulations on Survey and Design Management of Construction Projects", "Engineering Surveying Standards" and mandatory national standards; Meet the current national and local regulations, standards, and other requirements. The survey results, planning scheme, scheme design, preliminary design, and construction drawing design all meet the requirements of the bidding documents and are not subcontracted. 3、 This project is divided into one section, and the bidding content is as follows: (1) Measurement and survey: pipeline measurement, terrain measurement (including earthwork measurement), building settlement and foundation pit monitoring, building area (planning verification and property) measurement, road longitudinal and transverse section measurement, laying out and completion surveying, rainwater and sewage pipeline inspection, geological survey (including pipeline, road and ancillary building (structure) survey), etc; (2) Planning scheme: preparation and approval of road alignment planning and comprehensive pipeline planning; (3) Engineering design: scheme design, preliminary design (including budget preparation), construction drawing design, restoration of design drawings for existing buildings and municipal infrastructure; Note: For major or special projects, the tenderer may organize separate tenders as needed. Each applicant may apply to participate in the bidding for up to one section as mentioned above. 4、 The main qualification requirements that the bidding applicant should possess are: 1. The bidder should have both the following (1) and (2) conditions: (1) have a Class A or above qualification for geotechnical engineering survey in the field of engineering survey, and a Class B or above surveying qualification issued by the competent department of the surveying and mapping industry; (2) Having Class A or above qualifications in the municipal industry (road engineering) and Class A or above qualifications in the construction industry (building engineering). 2. The project leader to be selected for this project should meet the following requirements: Senior Engineer. 3. Other requirements: (1) Ability to independently enter into contracts; (2) Not in a state of being ordered to suspend business, having their bidding qualifications revoked, or having their assets taken over, frozen, or bankrupt; (3) The enterprise did not win the bid due to fraud or serious