陕西Announcement of Pre Qualification for EPC (Second round) of Planning Road and Supporting Pipeline Engineering on the East Side of Xi'an Chanba International Port Municipal Party School Relocation Project

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

1. Bidding conditions: The EPC (secondary) of the planned road and supporting pipeline engineering on the east side of the Xi'an Chanba International Port Municipal Party School relocation project has been approved for construction by the Development and Reform Bureau of Xi'an International Port Area under document No. [2023] 182. The project owner is the Xi'an International Port Area Land Reserve Center, and the project funds come from other projects, with a state-owned capital contribution ratio of 100.00%. The bidder is Xi'an International Port Area Land Reserve Center, and the bidding agency is Shaanxi Zongheng Project Management Co., Ltd. The project has met the bidding conditions and is now open for bidding. 2. Project Overview 2.1 Project Scale: The road length is about 1.2km, and the planned red line width is 25-30m; 2.2 Project Location: Inside Xi'an Chanba International Port; 2.3 Total project investment: 660900000 yuan; 2.4 Section Division: Section Name: EPC (Second) of the East Planning Road and Supporting Pipeline Engineering of the Xi'an Chanba International Port Municipal Party School Relocation Project; Lot number: E6101113506pUhgieZVR001; Section type: Engineering general contracting; 2.5 Bidding Scope: Section Name: EPC (Secondary) of the East Planning Road and Supporting Pipeline Engineering of the Xi'an Chanba International Port Municipal Party School Relocation Project, including the construction drawing design, procurement, and construction of the East Planning Road and Supporting Pipeline Engineering of the Municipal Party School Relocation Project. The bidding amount for this project is approximately 66.5 million yuan.; 2.6 Other:/. 3. Qualification Requirements for Applicants 3.1 Section Name: EPC (Secondary) of Planning Road and Supporting Pipeline Engineering on the East Side of the Xi'an Chanba International Port Party School Relocation Project. This qualification pre-approval requires applicants to have the qualifications of "Professional Class B or above in the Municipal Industry (Road Engineering)" and "General Contracting Level 1 for Municipal Public Works Construction" or above, or "Class B or above in the Municipal Industry (excluding gas and rail transit) and" General Contracting Level 1 for Municipal Public Works Construction "or above, or" Engineering Design Class B or above and "General Contracting Level 1 for Municipal Public Works Construction" or above, and Have corresponding abilities in personnel, equipment, funds, and other aspects. Among them, the bidder intends to appoint a project manager with the qualifications of Registered Constructor Level 1 or above, Registered Supervising Engineer or above, or Senior Engineer or above. 3.2 Section Name: EPC (Secondary) of the East Planning Road and Supporting Pipeline Engineering for the Relocation Project of the Party School of Xi'an Chanba International Port Municipal Committee. This qualification pre-approval is open to joint venture qualification pre-approval applications. The application for pre qualification of the consortium shall meet the following requirements: the leading unit of the consortium shall represent all parties of the consortium to handle all affairs during the bidding process of this project. The seals or signatures of the leading unit and its legal representative or authorized agent represent the corresponding seals or signatures of each member unit of the consortium. Each party of the consortium shall not bid separately or participate in other consortia in this project in their own name, otherwise their bid and any consortium bid associated with it will be rejected. If the above supporting documents involve a consortium, a consortium must be provided at the same time
View hidden content