江苏[0] Tender Announcement for the Construction Project of Student Dormitory No. 63 at Changshan Campus of Jiangsu University of Science and Technology
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
[0] Bidding Announcement for the Construction Project of Student Dormitory No. 63, Changshan Campus, Jiangsu University of Science and Technology Project No. ZJDT2023091047 Project Name: Jiangsu University of Science and Technology Changshan Campus No. 63 Student Dormitory Construction Project Section No. ZJDT2023091047004001 Section Name: Zhenjiang University Investment and Construction Development (Group) Co., Ltd. 2025-2026 Engineering Construction Project Survey and Design Service Framework Tendering Party Name: Agency Name: Project Approval Authority Name: Project Required Funds Source: Project Location: Project Scale Section Specific Information: The maximum number of sections that the applicant can apply for. Announcement Date: Announcement Date: Planned Start Date: Planned Completion Date: Announcement Start Date: May 6, 2025 Announcement End Date: May 12, 2025 Project Type: Design Applicant's Main Qualification Conditions: Applicant Qualification Category and Level: Proposed Applicants Qualification Level: Enterprise Performance, Reputation: Project Manager (Director)/Constructor Performance, Reputation: Other Conditions Announcement Information: Zhenjiang University Investment and Construction Development (Group) The bidding announcement for the survey and design service framework of engineering construction projects of Zhenjiang University Investment and Construction Development (Group) Co., Ltd. for 2025-2026 has been approved and implemented. The funding required for the project is self raised and has been implemented. Qualified potential bidders are now invited to participate in the bidding process for this project. Jiangsu Huicheng Investment Consulting Management Co., Ltd. is entrusted by the tenderer to be specifically responsible for the bidding matters of this project. 2、 Project Overview 1. Project Location: Zhenjiang City 2. Project Scale: Surveying, survey, and design services for engineering projects (including housing construction and municipal infrastructure) invested and constructed by Zhenjiang University Investment and Construction Development (Group) Co., Ltd. in 2025-2026, including Changshan Industry Education Integration Development Zone and the old campus managed and operated by the university group. 3. Construction period requirements: According to the scale of each individual project and the requirements of the tenderer, design personnel should be arranged reasonably to complete the design tasks in a timely manner and provide satisfactory services. 4. Quality standards: The quality standards comply with the current construction specifications and standards of the People's Republic of China, and strictly implement the "Regulations on Quality Management of Construction Projects", "Regulations on Survey and Design Management of Construction Projects", "Engineering Surveying Standards" and mandatory national standards; Meet the current national and local regulations, standards, and other requirements. The survey results, planning scheme, scheme design, preliminary design, and construction drawing design all meet the requirements of the bidding documents and are not subcontracted. 3、 This project is divided into one section, and the bidding content is as follows: (1) Measurement and survey: pipeline measurement, terrain measurement (including earthwork measurement), building settlement and foundation pit monitoring, building area (planning verification and property) measurement, road longitudinal and transverse section measurement, laying out and completion surveying, rainwater and sewage pipeline inspection, geological survey (including pipeline, road and ancillary building (structure) survey), etc; (2) Planning scheme: preparation and approval of road alignment planning and comprehensive pipeline planning; (3) Engineering Design: Building and Construction