浙江Survey and Design of Reserve Warehouse for High Standard Farmland Construction Project in Helong City, Jilin Province
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
Bidding Announcement for Survey and Design of Reserve Warehouse for High Standard Farmland Construction Project in Helong City, Jilin Province I Bidding conditions The survey and design of the reserve warehouse for the high standard farmland construction project in Helong City, Jilin Province of this bidding project has been approved for construction by the Agricultural and Rural Bureau of Yanbian Korean Autonomous Prefecture with the document Yanzhou Nongfu [2025] No. 10, and the capital source is the central financial fund+provincial financial fund, and ultra long term treasury bond. The bidder is the Agriculture and Rural Bureau of Helong City. The project has met the bidding conditions, and now the survey and design of the project will be publicly tendered through post qualification review. II Project Overview 2.1 Section Division and Bidding Content: Project Number Project Name Bidding Scope Construction Location JLHS2025-015 Jilin Province and Long City High Standard Farmland Construction Project Reserve Warehouse Survey and Design (Section 1) Surveying, survey, scheme preparation, preliminary design (including design text, location map, current situation map, planning map, engineering budget, preliminary design drawing, project schedule), construction drawing design (including design specification), etc. We plan to build 70000 acres of high standard farmland. Longcheng Town, Bajiazi Town, Xicheng Town, Fudong Town, Dongcheng Town, Toudao Town, Nanping Town, and Chongshan Town in Helong City. JLHS2025-016 Survey and Design of Reserve Warehouse for High Standard Farmland Construction Project in Helong City, Jilin Province (Second Section), including surveying, mapping, scheme preparation, preliminary design (including design text, location map, current situation map, planning map, engineering budget, preliminary design drawing, project schedule), construction drawing design (including design specification), etc. We plan to renovate and upgrade 96000 acres of high standard farmland. Longcheng Town, Fudong Town, Dongcheng Town, and Toudao Town in Helong City. 2.2 Construction scale: 166000 acres (including new construction and renovation projects), the specific annual implementation tasks shall be executed in accordance with the annual task approval of Jilin Province's high standard farmland construction project. Construction tasks that are not completed in the current year shall be postponed to the next year's survey and design tasks. 2.3 Division of sections: 2. 2.4 Service Period: From the date of signing the contract to the completion and acceptance of the project. Submission deadline: The preliminary design documents for the 2026 construction plan project will be completed by the end of June 2025; The preliminary design documents for the 2027 and 2028 construction plan projects shall be completed by the end of September 2025, and the specific completion time shall be subject to the latest requirements of the provincial and state documents. 2.5 Quality Standards: Complies with the "General Principles for High Standard Farmland Construction" (GB/T30600-2022), "Specifications for High Standard Basic Farmland Construction (Trial)", "High Standard Basic Farmland Construction Standards" (TD/T1033-2012), and relevant national and Jilin provincial regulations on high standard farmland construction. III 3.1 Qualification Requirements for Bidders 3.1 This bidding requires bidders to have independent legal person qualifications, valid business licenses, and possess Class B or above qualifications in surveying and mapping issued by relevant departments, Class C or above qualifications in geotechnical engineering survey issued by the construction administrative department (excluding comprehensive Class A qualifications in engineering survey), and Class B or above qualifications in engineering design of the water conservancy industry. Bidders must also have the corresponding ability to undertake this project in terms of personnel, equipment, funds, etc. 3.2 The project leader to be dispatched by the bidder must provide a note