新疆[Normal Announcement] Urumqi Airport New Terminal Area South Airlines Base Cargo Area Construction Project (Phase I) (Non Civil Aviation Engineering Part) Supervision Services (Secondary) Tender Announcement

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

The supervision services (secondary) for the construction project of the cargo area of the Southern Airlines Base in the new terminal area of Urumqi Airport (Phase I) (non civil aviation engineering part) have been approved by the documents. The project owner is Southern Airlines Logistics Co., Ltd. The project has met the bidding conditions and is now open for bidding. Qualified potential bidders are invited to participate in the bidding. The specific matters are announced as follows: 1. Project Overview and Bidding Scope: 1. Bidding Unit: Southern Airlines Logistics Co., Ltd. 2. Bidding Project Number: 650100231128006640043. Bidding Project Name: Construction Project of the Cargo Area of the Southern Airlines Base in the New Terminal Area of Urumqi Airport (Phase I) (non civil aviation engineering part) Supervision Services (Secondary) 4. Project Category: Housing Construction Engineering 5. Project type: Supervision 6. Qualification review method: Post qualification review 7 Funding source: 8. Bidding content and scope, and bidding plan description: The total construction area of the project is approximately 19513.57 square meters, with a single span of 32 meters. Among them, the construction area of the freight station (including attached buildings and canopies) is approximately 17385.09 square meters, the construction area of the checkpoint is approximately 538.29 square meters, the airside ramp is approximately 1590.19 square meters, and the non civil aviation engineering parts of the apron connection and supporting outdoor works. The full process supervision and consulting services within the scope of the complete set of construction drawings for this project (including bidding documents, bill of quantities, and supplementary Q&A documents). 2、 Section Information Section 1 (1), Section Number: 65010023112800664004001 (2), Section Name: Urumqi Airport New Terminal Area South Airlines Base Cargo Area Construction Project (Phase I) (Non Civil Aviation Engineering Part) Supervision Services (Secondary) (3), Is a consortium allowed: No (4), Section Contract Estimated Price: 2.619 million yuan (5), Deposit: 50000.0 yuan (6), Section (Package) Content: The total construction area of the project is about 19513.57 square meters, with a single span of 32 meters. Among them, the construction area of the cargo terminal (including pasting and canopy) is about 17385.09 square meters, and the construction area of the checkpoint is about 538.29 square meters. The area is approximately 1590.19 square meters for the airside ramp, as well as non civil aviation engineering components such as apron connections and supporting outdoor facilities. The full process supervision and consulting services within the scope of the complete set of construction drawings for this project (including bidding documents, bill of quantities, and supplementary Q&A documents). (7) Project scale of the section: 19513.57 square meters (8). Qualification requirements for bidders: 1. Bidders must be enterprises registered within the territory of the People's Republic of China and have independent legal person qualifications; 2. Bidders must possess valid qualification certificates and have a Class B or higher qualification for building construction engineering (professional supervision enterprise qualification) or a comprehensive supervision enterprise qualification for engineering supervision; 3. The bidder's name must be consistent with the enterprise name in the business license and qualification certificate; 4. Financial requirements: Bidders must provide financial audit reports audited by accounting firms or auditing institutions in the past three years (2021, 2022, 2023). If a newly established company cannot provide a complete three-year financial audit report, it must provide an existing one
View hidden content