广东Fire Protection Engineering for Plot 2-09 of Runhong Industry Phase II in Shenzhen, China Resources Land

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Pre Qualification Announcement (Z) ZSGG20250518025 According to the project progress, Shenzhen Runhongcheng-2 Phase Industry has met the bidding conditions and is now open for bidding. This section will adopt the pre qualification method. 1、 Basic Project Information: Construction Unit: Tenderer: Shenzhen Runhong Real Estate Co., Ltd. Construction Location: Tangwei Community, Fenghuang Street, Guangming District, Shenzhen, Guangdong Province Project Scale: Plot 09 covers an area of 25966.04 square meters, with a building area of approximately 175000 square meters and a total capacity of approximately 155000 square meters. Includes 3 factory buildings, one basement floor, and 12-13 above ground floors. Project funding source: Self raised bidding number: CGFA2025051600040001001 Project name: Shenzhen Runhong Cheng-2 Phase Industrial Section name: China Resources Land Shenzhen Runhong Industrial Phase II, Plot 2-09 Fire Protection Engineering Bidding content and scope: Plot 09 covers an area of 25966.04 square meters, with a building area of approximately 175000 square meters and a total capacity of approximately 155000 square meters. Includes 3 factory buildings, one basement floor, and 12-13 above ground floors. Delivery time/construction period: The tentative start date is August 30, 2025 (subject to the commencement order issued by the employer), and the completion time is August 30, 2026. A total of 365 calendar days. Note: For detailed information, please refer to the pre qualification document. The pre qualification document shall prevail. 2、 The applicant's qualification and ability requirements include qualification review items, qualification review standards, and qualification conditions. The applicant must have independent legal personality and provide a first-class qualification for professional contracting of fire protection facilities engineering issued by the housing and construction department. Performance requirements: From May 1, 2022 to the deadline for submitting pre qualification materials, if there is one or more signed fire engineering contracts with a total amount greater than 20 million yuan, performance proof documents (scanned copies of the winning bid notice or key pages of the contract) must be provided. The project manager qualification must provide a registered first-class construction engineer mechanical and electrical engineering professional qualification certificate, and the safety production license must be provided. Joint bidding is not allowed within the valid time. Creditworthiness requirements: Bidders (including member units of consortium bidding) are not identified as dishonest persons subject to enforcement on the "Credit China" website (www.creditchina. gov.cn). 3、 The pre qualification method adopts a limited quantity system, and the number of applicants who pass the pre qualification shall not exceed 7. 4、 Acquisition of Prequalification Documents (1) Acquisition Time: May 18, 2025- May 23, 2025 (2) Acquisition Method of Prequalification Documents: On the China Resources Group Shouzheng Electronic Tendering and Procurement Platform( https://www.szecp.com.cn )(hereinafter referred to as "Shouzheng Platform") is available for free download. (3) Obtain the pre qualification documents, log in to the supplier account, register for the bid section in the "Bidding Business Management ->Bid Preparation ->Bid Registration" section, and after successful registration, select the corresponding bid section and download the pre qualification documents in the "Pre Qualification Document Collection" section. Please refer to the platform manual under the website help center for details. 5、 The deadline for submitting pre qualification application documents is 09:00 on May 29, 2025 (Beijing time, subject to further notice if there are any changes)
View hidden content