广东Tender Announcement for Survey, Design, and Construction General Contracting of Maonan District Rural Revitalization Comprehensive Utilization Project (Phase II of All Towns and Chengnan Area) in Maoming City, Guangdong Province
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
Survey, design, and construction general contracting bidding announcement for the Maonan District Rural Revitalization Comprehensive Utilization Project (all towns and the second phase of the Chengnan area) in Maoming City, Guangdong Province. Investment project code: 2110-440902-01-3336365. Investment project name: Maonan District Rural Revitalization Comprehensive Utilization Project in Maoming City, Guangdong Province. Bidding project name: Maonan District Rural Revitalization Comprehensive Utilization Project (all towns and the second phase of the Chengnan area) in Maoming City, Guangdong Province. Survey, design, and construction general contracting section (package) name: Maonan District Rural Revitalization Comprehensive Utilization Project (all towns and the second phase of the Chengnan area) in Maoming City, Guangdong Province. Nature: Normal Qualification Review Method: Qualification Review. Implementation (Delivery) Location: Maonan District, Maoming City. Source of Funds: Finance. The sources of investment (district level) funds constitute fiscal investment (district level 100.00%) The scope and scale of the bidding project mainly include the continued construction of rural house style control engineering, village road and roadway renovation and supporting facilities engineering, and living environment improvement engineering for 9 towns and Chengnan Street in our district. The bidding content includes the survey, design, construction, and warranty repair tasks for this project. The main contractor for survey, design, and construction has been determined in this bidding process. After winning the bid, they will be responsible for the survey, design, construction, and warranty repair tasks of this project. The total planned construction period (delivery time) is 215 calendar days, including: (1) Survey period: 15 calendar days. (2) Design period: 30 calendar days (3) Construction period: 170 calendar days. The specific start time shall be subject to the commencement notice issued by the supervisor. The maximum bid price limit (ten thousand yuan) 5158.26 Whether to accept the consortium bid is the qualification requirement of the bidder: 1. The bidder must be an enterprise legal person legally registered in Chinese Mainland, and the industrial and commercial business license is valid. 2. Bidders must possess both ①②③④: ① Class A comprehensive qualification for engineering survey issued by the construction administrative department, or both Class C (or above) qualification certificates for engineering survey (engineering surveying) and Class C (or above) qualification certificates for engineering survey (geotechnical engineering (survey)); ② Class A comprehensive qualification for engineering design, or Class B (or above) qualification for engineering design in the municipal industry, or Class B (or above) qualification for engineering design in the municipal industry (excluding gas engineering and rail transit engineering), or Class C (or above) qualification for engineering design in the municipal industry (water supply engineering, drainage engineering, road engineering); ③ Class A comprehensive qualification for engineering design, or Class B (or above) qualification for engineering design and construction industry, or Class C (or above) qualification for engineering design and construction industry (building engineering); ④ Having a second level (or above) qualification for general contracting of municipal public works construction and a third level (or above) qualification for general contracting of construction projects, and obtaining a safety production license issued by the construction administrative department (within the validity period). 3. ① The proposed project survey leader must have a registered civil engineer (geotechnical) practice qualification certificate or an intermediate (or above) technical title in the field of surveying; ② The proposed project design leader must hold an intermediate (or higher) technical title in municipal or architectural disciplines; ③ The project leader (project manager) to be appointed has the qualifications of a municipal official