北京Tender Announcement for the Public Bidding Project of Greening Maintenance Services for the First, Second, Third, and Fourth Phases of Ningxia Electric Power Dam

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Chapter 1 Public Bidding 1. Bidding Conditions The name of this bidding project is: Ningxia Electric Power Dam Phase 1, 2, 3, and 4 Greening Maintenance Service Public Bidding, and the project bidding number is: CEZB250403266, The bidder is Guoneng Ningxia Daba Power Generation Co., Ltd. The project units are Guoneng Ningxia Daba Power Generation Co., Ltd., Guoneng Ningxia Daba Phase III Power Generation Co., Ltd., and Guoneng Ningxia Daba Phase IV Power Generation Co., Ltd. The funding source is self raised. The bidding agency is National Energy Group International Engineering Consulting Co., Ltd. This project has met the bidding conditions and is now undergoing domestic qualification review and open bidding. 2. Project Overview and Bidding Scope 2.1 Project Overview, Bidding Scope, and Section (Package) Division: 2.1 Project Overview, Bidding Scope, and Section (Package) Division 2.1.1 Project Overview: Guoneng Ningxia Daba Power Generation Co., Ltd., Guoneng Ningxia Daba Phase III Power Generation Co., Ltd., and Guoneng Ningxia Daba Phase IV Power Generation Co., Ltd. are located in Qingtongxia City, Yinnan District, Ningxia Hui Autonomous Region, about 67km north of Yinchuan City, about 4km from Daba Railway Station, and about 17km northeast of Qingtongxia City. The factory is located close to the west side of the Baolan Railway, with convenient transportation. We need to entrust the unit to complete the production area, non production area, and pre plant area of approximately 119000 square meters for Guoneng Ningxia Daba Power Generation Co., Ltd. (hereinafter referred to as the first and second phases of the dam); Guoneng Ningxia Daba Phase III Power Generation Co., Ltd. (hereinafter referred to as Daba Phase III) covers an area of approximately 78000 square meters in the production area, non production area, and pre plant area; Guoneng Ningxia Daba Phase IV Power Generation Co., Ltd. (hereinafter referred to as "Daba Phase IV") covers an area of approximately 59990 square meters in the production area, non production area, and front area of the plant: greening and environmental improvement within the above jurisdiction; Green soil improvement and soil replacement; Tree felling, transplanting and updating, and planting landscape trees; Installation and maintenance of green water system pipelines; Daily greening maintenance and upkeep in the project service area, road cleaning in non production areas, maintenance of road flood control facilities, and other project services. 2.1.2 Scope of bidding: Greening enhancement, planting and maintenance of green plants, maintenance of green facilities: soil improvement and replacement of green flower beds, deep plowing, fertilization and weed control, pest and disease prevention and control; Renewal and transplantation of aging trees (cleaning up garden waste), replanting of landscape trees and flowers, watering, pruning, shaping, fertilizing, pest and disease control (all newly planted trees must take windproof and overwintering protection measures), anti freezing insulation, and fire prevention; All work related to green maintenance, including water system installation, maintenance, and upkeep. Ensure that all green spaces and forests are beautiful and intact, with healthy plant growth and beautiful shapes. Phase I and II of the dam: production area, non production area, front area of the factory, and approximately 119000 square meters of green area around the factory perimeter: full area greening of the production area. Non production areas; Including the front area of the factory, the flower garden outside Gate 2, three parking lots outside the gate, the fourth staff canteen and its surroundings, and the industrial reservoir water photovoltaic area. Surrounding the factory area: including a green courtyard, Activity Center No.2, former Shuangde Courtyard, Industry and Trade Courtyard, Chemical Plant Courtyard, Fly Ash Courtyard, Operating Water Supply Purification Station (Qingtongxia Town) Courtyard and Orchard of 5000 square meters, Railway Sub yard Courtyard, Fleet Courtyard, and the surrounding area of Gate 3 Duty Room. Phase III of the dam: production area, non production area, and front area, approximately 78000 on both sides of the access road
View hidden content