北京Pre qualification Announcement for Curtain Wall Construction of Changping Future Meicheng Industrial Innovation Base Project (18 items including Factory Building 1)

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Detailed Content Template Start -------------------------------------------------------------------------------? Announcement Content: Changping Future Meicheng Industrial Innovation Base Project (18 items including 1 # factory building) Curtain Wall Engineering Construction Bidding Tit2end Qualification Pre Qualification Announcement Tit2end 1. Bidding Conditions Bidding Conditions The Changping Future Meicheng Industrial Innovation Base Project (18 items including 1 # factory building) has been approved for construction by the Economic and Information Bureau of Changping District, Beijing with the approval of Jingchang Economic and Information Bureau [2024] No. 17. The construction unit is Beijing Changfa Beautiful Health Industry Technology Co., Ltd., and the construction site is Xiaotangshan Beautiful Smart Garden in Changping District. The construction funds are self raised by state-owned enterprise units (local), with a contribution ratio of 100%. The curtain wall project of Changping Future Meicheng Industrial Innovation Base Project (including 18 items such as Factory Building 1) required for the overall construction of Tit2end has met the bidding conditions. The tenderer is China Communications Construction First Engineering Co., Ltd., and the bidding agency is Beijing Jingyuan Chengde Xin Engineering Management Co., Ltd. The bidding is now open, and interested potential bidders (hereinafter referred to as the applicants) are invited to submit pre qualification applications. Tit2end2. Project Overview and Bidding Scope 2. Subcontracting Project Overview and Bidding Scope end2.1 Name of Subcontracting Project in this Major: Changping Future Meicheng Industrial Innovation Base Project (18 items including 1 # Factory Building) Curtain Wall Engineering 2.2 Construction Scale of Subcontracting Project in this Major: Curtain Wall Area 43000 ㎡ Total Estimated Price: 31 million yuan 2.3 Construction Location of Subcontracting Project in this Major: Xiaotangshan Beautiful Intelligent Garden, Changping District (Xiaotangshan Town [Future Science City Research Achievement Transformation Base], Changping District (formerly Xiaotangshan Town Industrial Zone) (Phase I) CP04-0201-0010 Plot) 2.4 Construction Period Requirements for Subcontracting Project in this Major: 106 calendar days 2.5 Bidding Scope of Subcontracting Project in this Major: Curtain Wall Engineering Construction Drawing The content mainly includes the exterior decoration and related parts of the 1 # and 2 # security guards, 2 # supporting buildings, 1 # factory building, 3 # -8 # factory building, car entrance and exit passages, etc Including the following (detailed in the construction drawings and technical standard requirements): rear embedded parts, glass curtain walls, aluminum alloy doors and windows, aluminum curtain walls, aluminum suspended ceilings, aluminum alloy decorative lines, integrated insulation decorative panels, corrugated aluminum panels, integrated insulation corrugated metal panels, coatings, aluminum alloy louvers, grilles, glass balustrades, metal railings (according to the curtain wall drawings), eaves, canopies, entrance curtain walls and doors and windows (including door hoppers and door frames), floor bounce doors, electric folding doors, fire rescue windows, fire smoke exhaust windows and their controllers, other decorations that require keel cladding panels, as well as all internal sealing, lining, backing, fire prevention, smoke exhaust, protection, lightning protection, drainage and other related work related to the above projects. Conduct material retesting and performance function testing in accordance with relevant national regulations, conduct acceptance and provide corresponding materials in accordance with national regulations and government department requirements, and cooperate with relevant acceptance work.
View hidden content