山西Inquiry Announcement for Anti corrosion Project of Inner Wall of Water Diversion Steel Pipe at the Yellow River Water Intake of Wanjiazhai Hub
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
Inquiry Announcement for the Anti corrosion Project of the Inner Wall of the Water Diversion Steel Pipe at the Wanjiazhai Hub Yellow River Diversion Water Intake 1. Project Name: Anti corrosion of the Inner Wall of the Water Diversion Steel Pipe at the Wanjiazhai Hub Yellow River Diversion Water Intake 2. Main Content: Sampling non-destructive testing of the welds on the inner walls of the 1 # and 2 # water diversion steel pipes at the Yellow River Diversion Water Intake; The inner and outer walls of the steel pipe (including the expansion joint chamber) shall be sandblasted for rust removal and coated with anti-corrosion paint. Please refer to Attachment 1: Inquiry Document and Attachment 2: Technical Terms for details. 3. The construction period requires rolling implementation from 2025 to 2026. From August 1st to September 30th each year, the Shanxi Yellow River Diversion System will be organized and implemented during the suspension of water diversion, and the construction period shall not affect the normal production of the hub. 4. Qualification Requirements for Bidders 4.1 The contractor shall have independent corporate legal personality, possess a professional contracting qualification of first level or above for waterproofing, anti-corrosion and insulation engineering, and be within the validity period, and obtain relevant safety production licenses. Non destructive testing institutions should have a qualification certificate for inspection and testing institutions issued by the national supervision and management department. The testing products or categories, testing items or parameters, and testing scope authorized by the certificate should meet the safety testing requirements for pressure steel pipes. Please attach the relevant business license, qualifications, and personnel qualifications along with the quotation document. 4.2. Proof of performance in implementing similar projects in the past three years, based on the signed contract. 4.3 The bidder and its legal representative, as well as the proposed project manager, shall have no record of bribery crimes from 2022 to 2024. 4.4 The bidder is not a dishonest debtor (based on the results obtained through the "Credit China" website (www.creditchina. gov.cn) or various credit information sharing platforms on the day of bid opening). 4.5 This project does not accept consortium bidding. 4.6 This project shall not be subcontracted, nor shall it be subcontracted. 5. The announcement period is from May 19, 2025 to May 22, 2025. 6. Submission of quotation documents 6.1 Quotation documents shall be submitted by mail. Those who intend to participate in the quotation shall send the project name, quotation unit, contact person, and contact information to the email address before May 22, 2025: 67598596@qq.com Please send the quotation documents before May 25, 2025, and mail them to Guo, the Power Station Management Bureau of Wanjiazhai Town, Pianguan County, Xinzhou City, Shanxi Province. After the bidder sends out the quotation document, they need to send the tracking number to the same email address. If the quotation document is not sent with the tracking number before the deadline for mailing, the inquirer has the right to refuse it. 6.2 The quotation document shall be provided in duplicate (printed on both sides, otherwise the quotation document shall be invalid), with one original and one copy each. The original and one copy shall be sealed in a packaging bag and stamped with the bidder's official seal at the seal. The cover should indicate the project name, bidder name, contact person, contact phone number, and other information. The response documents should be packaged and sealed according to the above requirements, and then packaged according to the requirements of the courier company. The bidder will refuse to accept quotation documents that are delivered late, not delivered to the designated location, or not sealed as required. 7. Composition of quotation documents (including but not limited to the following) 7.1 Quotation letter 7.2 Identity proof of legal representative 7.3 Authorization letter 7.4 Priced bill of quantities 7.5 Qualification review materials 7.6 Implementation plan 7.7