重庆Announcement of the winning bidder for the EPC general contracting of the second phase (environmental governance) of the infrastructure supporting project for the renovation of old residential areas in Minde District, Yunyang County

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Announcement of Successful Candidates for EPC General Contracting of the Second Phase (Environmental Governance) of the Infrastructure Supporting Project for the Renovation of Old Residential Areas in Minde District, Yunyang County (Publicity Period: May 20, 2025 to May 22, 2025) Project Section Name: EPC of the Second Phase (Environmental Governance) of the Infrastructure Supporting Project for the Renovation of Old Residential Areas in Minde District, Yunyang County General contracting maximum price (or bidding control price) (yuan) 15231000.00 Project code 50023520250417001010101 Bidding announcement number/Bidder Yunyang County Xingyun Urban Management Service (Group) Co., Ltd. Bidder contact phone 19946764782 Bidding agency Chongqing Biotin Engineering Management Co., Ltd. Bidding agency contact phone 18696882632 Bid winner candidate sorting name Bid price (yuan) Duration (calendar days) Quality proposed project leader name Certificate name Certificate number First place Chongqing Construction 12th Construction Co., Ltd. (consortium member: China Railway 11th Bureau Group Fifth Engineering Co., Ltd.) Bid total price: 15172500.00 yuan, including design fee: 229500.00 yuan, fixed rate of 1.53%, of which The construction and installation engineering cost is 14943000.00 yuan, The fixed rate is 99.62%, which meets the requirements of the bidding documents. Yixue Second level Registered Constructor Yu 2502014201404305, ranked second, Hongdu Construction Group Co., Ltd. (consortium member: Shoufu Engineering Design Co., Ltd.), bid a total price of 13354500.00 yuan, including design fees of 228000.00 yuan, fixed rate of 1.52%, including construction and installation engineering fees of 13126500.00 yuan, fixed rate of 87.51%. Jiang Yuelong Second level Registered Constructor Gan 236202182536, ranked third, Chongqing Xunge Construction Co., Ltd. (consortium member: Zhongchuang Dunpu Engineering Consulting Co., Ltd.), bid a total price of 15214500.00 yuan, including design fees of 226500.00 yuan. The fixed rate is 1.51%, of which the construction and installation engineering cost is 14988000.00 yuan, The fixed rate is 99.92%, which meets the requirements of the bidding documents. Zhong Xingjin, a second level registered construction engineer, meets the qualification and ability conditions required by the bidding documents. The first winning candidate is Chongqing Construction 12th Construction Co., Ltd. (second level general contracting for municipal public works construction). The consortium members are China Railway 11th Bureau Group Fifth Engineering Co., Ltd. (first level general contracting for municipal public works construction). The second winning candidate is Hongdu Construction Group Co., Ltd. (first level general contracting for municipal public works construction). The consortium members are Shoufu Engineering Design Co., Ltd. (second level general contracting for municipal public works construction). The third winning candidate is Chongqing Xunge Construction Co., Ltd. (second level general contracting for municipal public works construction). The consortium members are Zhongchuang Dunpu Engineering Consulting Co., Ltd. Class B Municipal Industry Other contents that should be disclosed in the bidding documents include the safety production assessment certificate of the main person in charge of Chongqing Chunyue Construction Engineering Co., Ltd
View hidden content