山东Negotiation and Procurement Announcement for the Procurement of Underground Integrated Pump Station and Sewage Treatment Equipment for Jihe Renovation and Expansion Project
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
1. Procurement Conditions Project Number SDGS-FZ-2025-0381 Project Name: Procurement of Underground Integrated Pumping Station and Sewage Treatment Equipment for Jihe Renovation and Expansion Project. Project Location: Shandong Province - Jinan City. The purchaser is Qilu Expressway Co., Ltd. Procurement Method: Negotiation Procurement Category: Goods Procurement Organizational Form: Entrusted Procurement Agency: Shandong Tongzhou Engineering Consulting Co., Ltd. Qualification Review Method: Qualification Post Review Method: Comprehensive Scoring Method Qualification Review Method: Qualified Quotation Form: Single Envelope Plan Supply Period: 60 calendar days. The funding source and investment ratio are self raised by the enterprise. 2. Project Overview and Procurement Scope 2.1 Project Overview: The Jinan Heze section of the Jiguang Expressway has a total length of 153.6 kilometers and an implementation length of about 152.775 kilometers. The main line is renovated and expanded according to the standard of a two-way eight lane expressway, using "two side widening as the main method and partial single-sided widening as the auxiliary" The renovation and expansion plan has a design speed of 120km/h and a construction period of 36 months. To improve the drainage facilities of the square outside Pingyin South Toll Station and solve the problem of water accumulation at the weighing and testing equipment, it is proposed to install an underground integrated prefabricated pump station in the square outside Pingyin South Toll Station; To improve the sewage discharge facilities of the toll station in Changqing University City (including the Qilu Expressway Safety Experience Base) and solve the problem of sewage discharge, it is proposed to install an integrated sewage treatment equipment in the toll station campus of Changqing University City. 2.2 Procurement Scope: This project is divided into two sections, as follows: Section 1 includes the procurement, supply, installation, commissioning, and after-sales service of integrated sewage treatment equipment, including but not limited to If the content is incomplete or if there are attachments, please click on the website to view: http://www.ygcgfw.com/gggs/001002/001002001/20250519/9e22c05a-638f-47c9-bc45-b84644f96473.html