广东Supervision services for the resettlement area Phase I (excluding foundation pit support and earthwork excavation) and surrounding roads of Baitang Village Urban Village Renovation Project in Hualong Town, Panyu District, Guangzhou City [Electronic Label]

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

The first phase of the resettlement area (excluding foundation pit support and earthwork excavation) and surrounding road supervision services for the transformation project of Baitang Village in Hualong Town, Panyu District, Guangzhou City [Electronic Standard] Investment project code 2408-440113-04-01-154453 Investment project name: The first phase of the resettlement area (excluding foundation pit support and earthwork excavation) and surrounding road bidding project name: The first phase of the resettlement area (excluding foundation pit support and earthwork excavation) and surrounding road supervision services for the transformation project of Baitang Village in Hualong Town, Panyu District, Guangzhou City. Announcement on Supervision Services for Earthwork Excavation and Surrounding Roads Nature Normal Qualification Review Method Post Qualification Review Bidding Project Implementation (Delivery) The project is located in Hualong Town, northeast of Panyu District, specifically on the west side of Zhanmao East Road and the north side of Guangzhou International Commodity Exhibition and Trade City. The source of funds is state-owned or collective investment, which constitutes 100.00% of the bidding scope and scale. The land use nature of the resettlement residential land in this project is Class II residential land (R2), including two plots. The total land area of plot one is about 18080 square meters, and the total land area of plot two is 19905 square meters. The total planned construction area is 181444 square meters, including 125371 square meters for the capacity calculation part and 56073 square meters for the non capacity calculation part. The above ground buildings are mainly for the reconstruction of residential buildings and related supporting service facilities. The basement is planned to be equipped with motor vehicle parking spaces, non motor vehicle parking spaces, and civil air defense facilities. The project construction includes resettlement housing, roads within the community, green spaces, public service supporting facilities, etc. There are three supporting roads in the surrounding area of this project: ① the planned Zongshi Road (section from Zongjiu Road to Hengshi Road) located on the west side of the resettlement residential land, which is an urban branch road with a length of about 318 meters and a width of 15 meters; ② Located in the middle of the resettlement residential plot, the planned Hengxi Road (planned Zongshi Road to Zhanmao East Road section) is an urban branch road with a length of about 142 meters and a width of 15 meters. ③ Located on the north side of the resettlement residential plot, the planned Zongjiu Road (connecting the two main transportation arteries (Chuangzhan Avenue and Zhanmao East Road) and the resettlement area branch road, serving as the conversion service between the main road and the branch road) is an urban secondary road with a length of about 171 meters and a width of 30 meters. The final decision shall be based on the construction project planning permit. The scope of the bidding supervision project includes all the main buildings, road works, ancillary and supporting buildings and facilities, pipeline relocation and reconstruction within the red line range of the project site, as well as the surrounding municipal supporting facilities (including connecting roads, external water supply, external drainage, external electricity, gas, etc.) that are required for the project but outside the planned land red line range. This includes but is not limited to: (1) special foundation treatment, pile foundation and earthwork backfilling, construction engineering, prefabricated construction engineering, road engineering, decoration and renovation engineering (including fine decoration), electrical engineering, intelligent engineering, HVAC engineering, fire engineering, waterproofing engineering, mechanical and electrical equipment installation engineering (including diesel generators and environmental protection engineering), elevator engineering, civil air defense engineering, gas engineering, traffic markings, signs (including underground)
View hidden content