广东EPC Project of 70000 ton Reconstruction and Expansion Project of Coal Wharf 1 # Berth of the Pearl River Power Plant [Electronic Bid]

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

EPC [Electronic Bid] Investment Project Code 2308-440115-18-01-361370 Investment Project Name of the 70000 ton Reconstruction and Expansion Project of Coal Wharf 1 # Berth of the Pearl River Power Plant Bidding Project Name of the 70000 ton Reconstruction and Expansion Project of Coal Wharf 1 # Berth of the Pearl River Power Plant EPC Project Lot (Package) Name of the 70000 ton Reconstruction and Expansion Project of Coal Wharf 1 # Berth of the Pearl River Power Plant The nature of the EPC announcement Normal qualification examination Post qualification bidding project implementation (delivery) location Nansha District, Guangzhou City Source of funds Enterprise self raised funds constitute 100% Enterprise self raised bidding scope and scale The project is located in Xiaohu Operation Area, Nansha Port District, Guangzhou Port. The 1 # berth of the coal terminal of the Pearl River Power Plant was reconstructed and expanded from 50000 tons to 70000 tons coal unloading berth. The construction content is mainly to repair and strengthen the wharf structure. After the upgrade, the design annual throughput is 6.1 million tons/year, and the wharf shoreline remains unchanged at 290.08 meters. The bidding content includes the survey and design of dredging engineering, hydraulic construction engineering, electrical engineering, control engineering, water supply and drainage fire protection engineering, environmental protection engineering, temporary engineering, etc. of this project (including measurement and survey work in the preliminary design stage and construction drawing design stage; preliminary design and budget preparation, construction drawing design and budget preparation, equipment technical specification preparation, bill of quantities preparation, construction site coordination (including design changes and change budget), and related follow-up services (including completion drawing preparation) throughout the entire process of project completion) and construction (including equipment and material procurement). The construction period (delivery time) is 365 calendar days, and the maximum bidding price is 4266 yuan. Whether to accept consortium bidding is a requirement for bidding qualification and ability. The bidder's qualification requirement is to have the following qualifications issued by the Ministry of Housing and Urban Rural Development: (1) Comprehensive Class A qualification for engineering design or Class A qualification for engineering design in the water transportation industry or Class A qualification for engineering design in the water transportation industry (port specialty); (2) First level or above qualification for general contracting of port and waterway engineering construction. Note: If a consortium participates in bidding, the party in the consortium that undertakes all survey and design tasks must possess (1) qualifications, and the party in the consortium that undertakes all construction tasks must possess (2) qualifications. Qualification requirements for project leader: Project Manager: 1 person, with intermediate professional titles in water transportation engineering, a first-class registered constructor certificate in port and waterway engineering, a valid safety production assessment certificate (B certificate) issued by the transportation administrative department, and at least 1 work experience as a water transportation engineering construction project manager (project leader), deputy project manager, or chief engineer (project technical leader) in the past 5 years. Performance requirements for bidders: Within the past five years, undertake the following achievements: (1) Design no less than one 50000 ton or above (excluding structural design or structural reservation) dock project. (2) Construction of no less than one dock project of 50000 tons or above (excluding structural design or structural reservation). Note: The principles for determining the qualification review criteria and bonus points (if any) for bidders' performance are as follows: 1. The requirements in this appendix
View hidden content