内蒙古Competitive negotiation and procurement for the production, operation, maintenance, and other projects of the iron bearing useful rock dry selection and recovery system at the Mining Research Institute

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Project Number JO24080007 Project Name Mining Research Institute Iron containing Useful Rock Dry Selection and Recovery System Production, Operation, Maintenance and Other Projects Contract Competition Negotiation Procurement Release Date 2024/08/13 Registration Deadline 2024/08/16-17:00 Bid Start Date 2024/08/14-08:00 Bid Opening Date 2024/08/19-09:00 Project Category Service Unit Price Including Tax Address Hexi Industrial Zone, Kun District, Baotou City, Inner Mongolia (200 meters north of the intersection of Gangtie Street and No.1 Road) Project Announcement Content 1. Procurement Conditions and Methods 1.1 Procurement Conditions The procurement conditions have been met, and after approval, a public procurement activity is now being implemented for this service project, inviting qualified suppliers to participate in the procurement competition of this project. The purchaser is Baosteel Group Mining Research Institute (Limited Liability Company). Project No. JO24080007 Procurement Method: Competitive Negotiation 2. Procurement Content and Scope Project JO24080007, Mining Research Institute's iron containing useful rock dry selection and recovery system production, operation, maintenance and other project contracting competitive negotiation procurement, the content is as follows, details are detailed in the attached announcement, section name, service period (maintenance and repair projects are planned construction period), payment terms, maximum bidding limit price including tax (yuan), bid security deposit (yuan) Note 1: After the signing of the contract for the mining research institute's iron containing useful rock dry selection and recovery system production, operation, maintenance and other project contracting, the actual production will be settled based on the winning unit price 16 months after the contract is signed; The payment methods include: Yunxin, E-Xintong, and acceptance bills (with the seller bearing the interest subsidy). After the contract is signed, Party B shall pay a safety risk deposit of 500000 yuan within 15 days. Please refer to the detailed maximum price of 100000.00 for the bidding content and scope of responsibilities. The iron bearing useful rock dry selection and recovery system project of the Mining Research Institute is expected to have an annual production plan of about 3 million tons of iron coarse concentrate from August 25, 2024 to December 31, 2025. The production line includes facilities for bulk dry sorting process (one roughing belt, one concentrate belt, two sets of magnetic separators); Distribution facilities (dry selection system distribution, transformers, transmission systems); Dust removal facilities (main belt conveyor unloading area dust removal system, dry selection area dust removal system); Automation and monitoring facilities (system monitoring, system control, system management, system security protection, system communication), etc. The production operation, organizational management, material transportation, job duty, on-site inspection, maintenance and repair of production equipment and facilities, safety and environmental protection equipment and facilities, public auxiliary equipment and facilities, as well as the procurement, installation and maintenance of required materials, spare parts and components, environmental sanitation, slag removal, security and other related business to ensure normal production will be tendered and purchased. After the contract is signed, Party B shall pay a security risk deposit of 500000 yuan within 15 days. 3. Supplier qualification requirement 3.1 is an independent legal entity registered within the territory of the People's Republic of China; 3.2 Qualification and performance requirements are detailed in the table below. 3.3 Consortium participation in procurement activities is not accepted for this procurement. Section Name Qualification Requirements Performance Requirements 1. Mining Research Institute's Iron containing Useful Rock Dry Selection and Recovery System Production, Operation, Maintenance, and Project Contracting 1. Effective Non Coal Mine Safety Production License must be provided
View hidden content