北京Tender Announcement for the Public Bidding Project of Guoyuan Power Fugu Company's Ash Field Ash Dam, Flood Control Dam Elevation, Geomembrane Laying, Water Storage Well Elevation, Ash Transport Road Repair, and Building Repair Engineering

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Chapter 1 Public Bidding 1. Bidding Conditions The name of this bidding project is: Guoyuan Electric Power Fugu Company Power Plant Ash Field Ash Dam Flood Control Dam Heightening, Geomembrane Laying, Water Storage Well Heightening, Ash Transport Road Repair and Building Repair Project Public Bidding, Project Bidding Number: CEZB250004485, the bidder is Shaanxi Deyuan Fugu Energy Co., Ltd., the project unit is Guoshen Company Shaanxi Deyuan Fugu Energy Co., Ltd., and the funding source is self raised. The bidding agency is National Energy Group International Engineering Consulting Co., Ltd. This project has met the bidding conditions and is now undergoing domestic qualification review and open bidding. 2. Project Overview and Bidding Scope 2.1 Project Overview, Bidding Scope, and Section (Package) Division: 2.1.1 Project Overview: Fugu Power Plant is located in Miaogoumen Town, Fugu County, Shaanxi Province. Two 600MW generator units, # 1 and # 2, were completed and put into operation in 2008, and two 660MW generator units, # 3 and # 4, were completed and put into operation in 2020. The power station is 40 kilometers away from Fugu County, with convenient transportation. 2.1.2 Bidding Scope: (1) According to the requirements for ash stacking in the ash yard, it is necessary to gradually raise the seven level sub dams and the inner flood control dams of the ash yard. The length of the dam body is about 300m, and the length on both sides of the ash yard is 3500 meters (about 1550 meters on the north side and about 1950 meters on the south side); (2) According to the requirements for ash stacking in the ash yard, it is necessary to gradually increase the height of the # 1 and # 2 water collection wells by 4 meters, lay a 6-meter anti-seepage geomembrane on the slope of the ash yard, and extend the length of the two sides of the ash yard by 3500 meters (about 1550 meters on the north side and about 1950 meters on the south side). (3) Phase I plant building renovation project: Phase I sewage treatment pump room, wastewater treatment room, sewage lifting pump room, comprehensive water pump room and distribution room, chemical water boiler supply water room, water treatment neutralization water pump room, urea preparation area and distribution room, Phase I ash silo air compressor room, roof of # 1 and # 2 furnace pump rooms, top of Phase I centralized control room, 17.5-meter coal feeder aisle for # 1 and # 2 furnaces, 14.5-meter coal feeder aisle for # 3 and # 4 furnaces, roof fans and outlet pipes for # 1, # 2, # 3, and # 4 furnaces have severe rain leakage, requiring replacement of color steel plates, construction of waterproof rolls SBS, and spraying of polyurea waterproof coating on the roof; #1. The roof of the denitration distribution room in furnace # 2 is severely damaged and needs to be replaced; Regularly dredge underground sewage and industrial water pipelines. 2.1.3 Planned construction period: The total planned construction period of this project is 180 days (the start time shall be subject to the notice of the tenderer). 2.1.4 Quality Requirements: The bidder shall establish quality objectives, prepare a quality plan, strengthen process control, and clarify the responsibilities of all parties before the commencement of the project. The bidder shall establish a quality management network and clarify the responsibilities of personnel at all levels. The bidding party should continuously establish and improve various management systems to ensure the effective operation of the project quality management system. The bidder shall be equipped with complete quality inspection equipment. The bidding party shall refine the quality objectives, formulate quality control measures and optimization measures for sub projects, and implement them. Bidders should strengthen the protection of finished products. The bidder shall comply with the construction schedule and quality management regulations of the tenderer, and the tenderer has the right to assess the bidder's violation of regulations based on relevant construction quality management regulations. The bidding party adopts new processes, materials, and methods
View hidden content