北京Announcement of Public Bidding for the Integration and Upgrade of Reliability Management Information System for Unit 2 Equipment of Guoyuan Power and Fengdian Plant
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
Chapter 1 Public Bidding 1. Bidding Conditions The name of this bidding project is: State Grid Energy and Fengdian Power Plant # 2 Unit Equipment Reliability Management Information System Integration Upgrade Construction Service Public Bidding, project bidding number: CEZB250004488, the bidder is State Grid Energy and Fengdian Power Co., Ltd., the project unit is State Grid Energy and Fengdian Power Co., Ltd., and the funding source is self raised. The bidding agency is National Energy Group International Engineering Consulting Co., Ltd. This project has met the bidding conditions and is now undergoing domestic qualification review and open bidding. 2. Project Overview and Bidding Scope 2.1 Project Overview, Bidding Scope and Bid Section (Package) Division: State Grid Hefeng Coal Power Co., Ltd. and Fengdian Power Plant are located in the south of the middle of Shajihai Mine Field, about 500m away from the southern boundary. The Shajihai Mine Field is located in the east longitude of 86 ° 27 ′ 54 ″ ~ 86 ° 43 ′ 46 ″, and the north latitude of 46 ° 34 ′ 23 ″ ~ 46 ° 41 ′ 27 ″. The plant site is located about 63km southeast of Hoboksar Mongol Autonomous County in Xinjiang, and about 50km northeast of Hetuoluogai Town. The plant site is used as The administrative division of the coal power integration plant is under the jurisdiction of Hoboksar Mongol Autonomous County. The power plant construction has two 300MW generator units with a total installed capacity of 600MW. The bidding scope: This project plans to integrate and upgrade the reliability management information related systems for Unit 2 equipment. Based on the existing equipment management information systems such as equipment ledger, defect management, and work order management, various systems will be integrated to complete data aggregation and business integration; At the same time, system upgrade and construction will be carried out, real-time data from SIS equipment will be integrated, and software functional modules such as equipment management, expert knowledge center, comprehensive equipment supervision, equipment failure warning, maintenance strategy support, and office assistance will be built to ultimately achieve digitalization of the entire process and means of equipment management business. Service period: The goods will arrive within 30 days after the contract is signed, and the installation and commissioning work will be completed within 270 days. The specific start date shall be subject to the notice of the tenderer. 2.2 Other:/3. Qualification Requirements for Bidders 3.1 Qualification Conditions and Performance Requirements: [1] Qualification Requirements: Bidders must be independent legal persons or other organizations registered in accordance with the law, and must provide valid supporting documents. 【2】 Financial requirements: [3] Performance requirements: From June 2020 to the bidding deadline (based on the contract signing date), bidders must have at least 2 contract performances for the intelligent application of thermal power unit equipment operation and maintenance (including at least 4 out of 6 items: integrated platform, big data platform, equipment reliability management, equipment intelligent monitoring, equipment fault warning, and equipment status maintenance). The bidder must provide a contract that can prove the performance requirements of this bidding. The scanned copy of the contract must include at least: the stamped pages of both the buyer and seller, the date of contract signing, and the key information pages in the performance requirements. 【4】 Credit requirements:/[5] Qualification requirements for project leader:/[6] Requirements for other key personnel:/[7] Equipment requirements:/[8] Other requirements:/3.2 This project does not accept consortium bidding. 4. Obtaining the bidding documents 4.1 Any interested bidder must obtain the bidding documents from the National Energy Administration before purchasing the bid