北京Tender Announcement for the Public Bidding Project for the Replacement and Renovation of the Level Gauge on the Steam Turbine Side of Unit 2 at Guoyuan Electric Power and Fengdian Plant
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
Chapter 1 Public Bidding 1. Bidding Conditions The name of this bidding project is: State Grid Energy and Fengdian Power Plant # 2 Steam Turbine Side Liquid Level Gauge Replacement Service Public Bidding, Project Bidding Number: CEZB250004490, the bidder is State Grid Energy and Fengdian Power Co., Ltd., the project unit is State Grid Energy and Fengdian Power Co., Ltd., and the funding source is self raised. The bidding agency is National Energy Group International Engineering Consulting Co., Ltd. This project has met the bidding conditions and is now undergoing domestic qualification review and open bidding. 2. Project Overview and Bidding Scope 2.1 Project Overview, Bidding Scope and Bid Section (Package) Division: State Grid Hefeng Coal Power Co., Ltd. and Fengdian Power Plant are located in the south of the middle of Shajihai Mine Field, about 500m away from the southern boundary. The Shajihai Mine Field is located in the east longitude of 86 ° 27 ′ 54 ″ ~ 86 ° 43 ′ 46 ″, and the north latitude of 46 ° 34 ′ 23 ″ ~ 46 ° 41 ′ 27 ″. The plant site is located about 63km southeast of Hoboksar Mongol Autonomous County in Xinjiang, and about 50km northeast of Hetuoluogai Town. The plant site is used as The administrative division of the coal power integration plant is under the jurisdiction of Hoboksar Mongol Autonomous County. The power plant has two 300MW generator sets with a total installed capacity of 600MW. The bidding scope includes upgrading and renovating the guided wave radar level gauges for the high/low heater, deaerator, condenser and other systems of Unit # 2, upgrading and renovating the steam side and water side primary valves, drain valves, level gauge containers, and insulation sleeves of the high/low heater, deaerator, condenser level gauges, replacing relevant pipelines and cables connected to the site and instrument end, responsible for dismantling all equipment such as old instruments, cables, accessories, etc. on site, installing, drilling, cutting, welding, debugging and personnel training for new level gauges and containers, as well as wiring, configuration, calibration and other work for the instrument end and DCS control end, and providing lifelong free technical services without limit on the number of times. Construction period: Starting from the date of contract signing, the equipment shall be delivered within 30 days, and the on-site project construction shall be completed within 30 days after receiving notification from the bidding party. Lifetime free technical services shall be provided, with no limit on the number of times. 2.2 Other:/3. Qualification Requirements for Bidders 3.1 Qualification and Performance Requirements: [1] Qualification Requirements: (1) Bidders must be independent legal persons or other organizations registered in accordance with the law and provide valid supporting documents. (2) Bidders must possess and provide valid Level 3 or above qualification certificates for general contracting of power engineering construction. (3) Bidders must possess and provide valid safety production license and qualification certificates. 【2】 Financial requirements: [3] Performance requirements: From June 2020 to the bid deadline (based on the contract signing time), bidders must have at least 2 contract performances for the supply, installation, modification, or commissioning of instruments and meters for high and low heaters, deaerators, or condensers. The bidder must provide a contract that can prove the performance requirements of this bidding. The scanned copy of the contract must include at least: the stamped pages of both the buyer and seller, the date of contract signing, and the key information pages in the performance requirements. 【4】 Credit requirements: [5] Project manager qualification requirements: [6] Other key personnel requirements: Technical leader:/Safety leader:/Quality leader:/[7] Other