山东ESLSEALION Qingdao Fire and Lifesaving Annual Inspection
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
Serial number * item code * material name * model specification * purchase quantity * unit delivery time Material description 1R11A00001180EBDannualservice item 1.0 missing 2025-05-24 Repair reason: EEBD annual inspection total10setsandrenewedon14th-Apr-2025.ForthistypeEEBD,itsMFGdateMar-2025,LifeDateisMar-2035. Note: Ship application number SEALION-R-010-2025, attached with the application form. Preliminary opinion of the vessel: Agree to the required spare parts and materials: None&Ship application number SEALION-R-010-2025, attached with the application form. 2R11A00001181Fixed? CO2? System 5-year blowdown without 1.0 item. Repair reason on May 24, 2025: Provide five-year service according to regulatory requirements, including CO2 system main valve disassembly and inspection, drive pipeline tightness test, manifold tightness test, etc. Note: Ship application number SEALION-R-009-2025, attached with the application form. Preliminary opinion on the vessel: Agree to the required spare parts and materials: None&Ship application number SEALION-R-009-2025, attached with the application form. 3R11A000001182 Liferaft Manual Service, item 1.0, maintenance reason: Life raft annual inspection, requiring manufacturer or manufacturer agent service, issuing manufacturer certificate. HR Urenevon 2025/04/14 Remarks: Ship application number SEALION-R-008-2025, the application form and previous certificates are attached. Preliminary opinion on the vessel: Agree to the required spare parts and materials: None. The vessel application number is SEALION-R-008-2025, and the application form and previous certificates are attached. 4R11A00001183Immersionsuit without item 1.0. Repair reason: Annual inspection of immersion cold proof clothing, 29 sets of cold proof clothing (28 VIKING+1 JIANG SUHUAYAN) need to undergo annual inspection and issue a report; Before landing, the service provider needs to conduct an on-site inspection to see if there is any delamination or damage. If the ship responds with delamination or damage after landing, it will not be recognized and the service provider will be responsible for it. Note: Application number: SEALION-R-007-2025, attached are the application form and service reports from previous years. Preliminary opinion of the vessel: Agree to the required spare parts and materials: None&Application number: SEALION-R-007-2025, attached are the application form and previous service reports. 5R11A00001184E.WATER? MIST? FIRE? EXTINGGUISHING? SYSTEM item 1.0 is missing on May 24, 2025. Reason for maintenance: Annual inspection of sprinkler system (equipment is in good condition, mainly certificate issuance). Remarks: Ship application number: SE