浙江Newly built Hangshaotai Railway Wenling Yuhuan Section DK30+349 and DK30+682 Relocation of Rural Roads Project

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Content Start Project Number CMZ-2025-0133 Project Name New Railway Hangshaotai Line Wenling to Yuhuan Section DK30+349 and DK30+682 Relocation of Rural Roads Project Public Bidding Method Project Estimation 572307000 yuan Project Classification Small scale Engineering Project Category Construction Entrusting Party Name Chumen Town People's Government in Yuhuan City Contact Person Ye Chenwei Contact Person 13967690592 Agency Name Taizhou Zhenghe Engineering Cost Consulting Co., Ltd. Contact Person Lv Xinqi Contact Person 13777605577 New Railway Hangshaotai Line Wenling to Yuhuan Section DK30+349 and DK30+682 Relocation of Rural Roads Project Bidding Announcement 1. Bidding Conditions This bidding project is a new railway Hangshaotai Line Wenling to Yuhuan Section DK30.+349 and DK30+682 The relocation of rural roads has been approved by relevant departments, and the tenderer (project owner) is the People's Government of Chumen Town, Yuhuan City. The construction funds are allocated and entrusted to Taizhou Zhenghe Engineering Cost Consulting Co., Ltd. for bidding agency. The project has met the bidding conditions and is now open for bidding for its construction. 2. Project Overview and Bidding Scope 2.1 Project Overview: This project is located in Yuhuan City and consists of two road projects: the relocation of rural roads from the Wenling to Yuhuan section of the newly built railway Hangshaotai Line at DK30+349, and the relocation of rural roads from the Wenling to Yuhuan section of the newly built railway Hangshaotai Line at DK30+682. The main purpose of this project is to relocate these two roads: (1) The relocation of rural roads from the Wenling to Yuhuan section of the newly built railway Hangshaotai Line at DK30+349 is located in Yuhuan City. Due to the occupation of the original mountain dirt road pedestrian passage by the railway bridge and other reasons, the affected roads will be relocated. A total of one relocated road is DK30+349. Road grade: rural road; Design speed: 10-20km/h; Road surface type: 500px cement concrete surface layer+375px cement stabilized crushed stone layer+roadbed filling and excavation. The bidding content and scope of this project include: roadbed filling and excavation, concrete pavement pouring, addition of traffic safety facilities, construction of retaining walls, and addition of uphill steps within the scope of the construction drawings; (2) The rural road relocation project for the Wenling to Yuhuan section of the newly built Hangzhou Shaotai railway line, DK30+682, is located in Yuhuan City. Due to factors such as bridge pier occupation, the affected roads will be relocated. There is a total of one relocated road in this project, DK30+682. Road grade: rural road; Design speed: 10-20km/h; Road surface type: 500px cement concrete surface layer+375px cement stabilized crushed stone layer+roadbed filling and excavation. The bidding content and scope of this project include: roadbed filling and excavation, concrete pavement pouring, addition of waveform guardrails, slope protection, etc. within the scope of the construction drawings. 2.2 The bidding control price for this project is 572307 yuan, as detailed in the construction drawings and the tenderer's budget statement; 2.3 Scope of Tender: All quantities included in the construction drawings and budget documents provided by the tenderer (refer to the tenderer's budget document for details). 2.4 Construction period requirement: not exceeding 30 days (calendar days) (specific subject to the commencement notice of the employer). 2.5 Quality
View hidden content