安徽Procurement Announcement for the Renovation of Toilets and Gas Station Roads on the East Side of the Small Mobile Machinery Warehouse of Three Companies (Ma'anshan Port (Group) Co., Ltd.)
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
Announcement on the Procurement of the East Side Toilet and Gas Station Road Renovation Project of the Three Company Small Mobile Machinery Warehouse (Ma'anshan Port (Group) Co., Ltd.) Content 1: Project Overview Project Brief Description Project Scope: The renovation project of the east side toilet and gas station road of the Three Company Small Mobile Machinery Warehouse mainly includes: (1) Renovation of the east side toilet of the Three Company Small Mobile Machinery Warehouse: Demolition and transportation of the men's toilet urinal, renovation of three men's toilet drainage and water supply pipelines, and addition of three floor standing induction urinals. (2) 39.5 square meters of gas station road renovation: top-down approach, with a C35 concrete surface layer thickness of 25cm, double layered and bi-directional reinforcement of Ø 14 steel bars, a C15 concrete cushion layer thickness of 10cm, concrete removal and transportation, and base compaction. (3) Dismantling and replacement of the ceiling panel for the second floor toilet in the office building of Company 2: 23.83 square meters. (4) The parking lot in front of the mechanical and electrical company is 20 * 5.5m, with a C25 concrete floor thickness of 10cm. (5) The foundation maintenance of the 1 # box transformer of the mechanical and electrical company covers an area of 57.5 square meters. (6) Dismantling and replacement of steel fireproof door (Class A) for 7-2 distribution room door, covering an area of 2.796 square meters. (7) Repair of 138.52 square meters of interlocking blocks on Rentouji Road. Maximum price limit: 73400 yuan. Detailed requirements for engineering procurement with a maximum price limit of 73400.00 yuan (1) 6-3 Worker's Rest Room Toilet Renovation: Demolition and transportation of the male toilet urinal, renovation of 3 male toilet drainage and water supply pipelines, and addition of 3 floor standing induction urinals. (2) 39.5 square meters of gas station road renovation: top-down approach, with a C35 concrete surface layer thickness of 25cm, double layered and bi-directional reinforcement of Ø 14 steel bars, a C15 concrete cushion layer thickness of 10cm, concrete removal and transportation, and base compaction. (3) Dismantling and replacement of the ceiling panel for the second floor toilet in the office building of Company 2: 23.83 square meters. (4) The parking lot in front of the mechanical and electrical company is 20 * 5.5m, with a C25 concrete floor thickness of 10cm. (5) The foundation maintenance of the 1 # box transformer of the mechanical and electrical company covers an area of 57.5 square meters. (6) Dismantling and replacement of steel fireproof door (Class A) for 7-2 distribution room door, covering an area of 2.796 square meters. (7) Repair of 138.52 square meters of interlocking blocks on Rentouji Road. 2、 Quotation requirements: Delivery address: No. 47 Changjiang Road, Ma'anshan Port (Group) Co., Ltd. Whether the quotation includes tax or not, please note that 9% of the material quotation remarks can be left blank. Special invoices are required for suppliers. The validity period of the quotation cannot be filled in. Whether to upload the quotation sheet is required to enter the supplier database. This project accepts all suppliers who have been registered and approved in Anhui ports and meet the requirements of this announcement. The basic documents of the suppliers include business license, safety production license, construction engineering general contracting level two or above (or construction decoration engineering professional contracting level two or above or port and waterway engineering construction general contracting level two or above). The project manager who intends to invest in this project has a registered level one or two constructor certificate and safety B certificate, full-time safety certificate. Employee with Safety Officer C Certificate (within validity period) 3. Evaluation rules: Lowest price method 4. Deposit collection method: no fee 5. Document fee Collection method: no document fee 6. Quotation instructions 1. Quotation deadline: 2025