安徽[Anhui Construction Engineering Anhui Water Resources] Anhui Water Resources Second Branch Hanshan County Small and Medium sized River Flood Control System Shortfall Project Qingxi River Treatment Project Gravel and Graded Gravel Procurement Section 1 Procurement Announcement
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
Inquiry Announcement: We are now inquiring about the procurement of crushed stone and graded crushed stone for our company's Qingxi River Treatment Project (Section 2) in Hanshan County. Qualified suppliers are welcome to participate in bidding. Choose a reasonable low price to win the bid under the same conditions. 1、 Inquiry Project Overview 1. Project Name: Han Shan County Small and Medium sized River Flood Control System Shortfall Project Han Shan County Qingxi River Treatment Project Construction (Second Section) 2. Project Location: Qingxi Town, Han Shan County, Ma'anshan City, Anhui Province 3. Procurement Content: Crushed stone, graded crushed stone, with a main work volume of 9800 tons. 2、 Procurement Number: ACEG-202505621001001 III. Bidder Qualification Requirements 1. Legal Person Qualification Requirements: Having independent legal person qualification and a valid business license. 2. Qualification and certificate requirements:/3. Similar performance requirements: From January 1, 2021 to the bidding deadline, a gravel supply performance contract with an amount of not less than 500000 yuan must be signed (based on the contract signing time and amount, each contract must be accompanied by an invoice or bank transfer record of not less than 70% of the required performance contract). 4. Requirements for on-site personnel to be dispatched:/5. Other requirements: 1. During the construction process, Party A has the right to settle based on the actual quantity and not exceeding the list quantity, and Party B shall not make any claims against Party A based on the difference between the actual quantity and the purchase contract quantity; 2. During the performance of the contract, the evaluation shall be based on the product quality, supply capacity, and after-sales service of Party B. If it is found that Party B's materials are unqualified or their supply capacity cannot meet the on-site time requirements, Party A has the right to unilaterally terminate the contract; The first party has the right to pursue economic claims and other responsibilities against the second party for the economic losses and impacts caused by this; At the same time, Party B shall not sue or hold Party A responsible for such reasons. 6. Not restricted from bidding by Anhui Construction Engineering Water Resources Development Investment Group Co., Ltd. and Anhui Construction Engineering Group Co., Ltd. 4、 1. Anyone who intends to participate in bidding and meets the qualification requirements, please log in to the Anhui Construction Engineering Electronic Procurement Platform (website) before the bidding deadline https://cg.aceg.com.cn/ )Find the corresponding project and download the inquiry and procurement documents. 2. Inquiry document production cost/yuan/copy (non refundable). 5、 Quotation Method and Requirements: 1. Bidders are required to submit their bids online on the Anhui Construction Engineering Group's electronic procurement platform before the deadline, without the need to submit a quotation on site. Bidders are responsible for the clarity of the text, and any unclear or illegible key words will be treated as invalid bids. 2. Deadline for quotation: 15:00 on May 27, 2025. Bidders shall fill in their quotations on the electronic procurement platform before the deadline, sign and stamp the "Bid Information", scan and upload it as an attachment to the system. After the deadline for quotation, any bid without a quotation on the platform and without the required signature and upload of the bidding information to the platform shall be invalid. 3. The bid security deposit for inquiry is RMB 5000 (Five Thousand Yuan). The bidder shall transfer the full amount from the bidder's basic account in one lump sum by bank transfer. The account transferred by the bidder must be consistent with the account reserved at the time of registration on the bidding platform. If the bid security deposit of the bidder is not verified and received on the bidding platform by the deadline, the bid shall be invalid. bid