内蒙古Announcement of Public Bidding for Printing Materials, Design and Production, Office Services and Other Projects of Zhuneng Group in 2025

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Chapter 1 Public Bidding 1. Bidding Conditions The name of this bidding project is: Public Bidding for Printing Materials, Design and Production, Office Services and Other Projects of Zhuneng Group in 2025. The project bidding number is CEZB250304504, and the bidder is Guoneng Zhuneng Group Co., Ltd. The project unit is Guoneng Zhuneng Group Co., Ltd. The funding source is self raised. The bidding agency is National Energy Group International Engineering Consulting Co., Ltd. This project has met the bidding conditions and is now undergoing domestic qualification review and open bidding. 2. Project Overview and Bidding Scope 2.1 Project Overview, Bidding Scope, and Section (Package) Division: 2.1.1 Project Overview: Shenhua Zhungeer Energy Co., Ltd. and China Shenhua Energy Co., Ltd. Halwusu Open pit Coal Mine are located in Xuejiawan Town, Zhungeer Banner, Ordos City, at the border of Mongolia, Shanxi, and Shaanxi, adjacent to the Yellow River to the east and 120 kilometers north of Hohhot City, which is the most dynamic economic development area in Inner Mongolia Autonomous Region. In order to meet the daily office and conference printing and production service projects of various departments of the company's headquarters, some directly affiliated institutions, and managed directly affiliated units, the company organizes the procurement of daily office and conference related material printing, graphic design and production, and other office services. 2.1.2 Bidding Scope: This project is divided into three sections, including: Section 1: Printing, design, production, and office services for the headquarters of Zhuneng Company and the Harbin Wusu Open pit Coal Mine; Section 2: Harbin Wusu Open pit Coal Mine, Infrastructure Engineering Management Center, Coal Distribution Company, Public Utility Company, Circular Economy Industry Incubation Base, Shared Service Center, Science and Technology Research Institute, Explosive Factory, Science and Technology Innovation Center, Zhuneng Power Supply Company, Administrative Management Center Printing, Design and Production, and Office Services, etc; Third section: Heidaigou open-pit coal mine, Zhuneng intelligent information center, Zhuneng coal preparation plant, Harbin coal preparation plant, Zhuneng equipment maintenance center, Harbin equipment maintenance center, Zhuneng material supply center, Harbin material supply center, Zhuneng emergency support center, Harbin emergency support center, Zhuneng production service center, Harbin production service center printing, design, production and office services, etc. 2.1.3 Service period: 36 months after the contract is signed or the contract amount is fulfilled, whichever comes first. The specific start date shall be subject to the notice from Party A. 2.2 Other:/3. Qualification Requirements for Bidders 3.1 Qualification Conditions and Performance Requirements: [1] Qualification Requirements: Bidders must be independent legal persons or other organizations registered in accordance with the law, and must provide valid supporting documents. 【2】 Financial requirements: [3] Performance requirements: From May 2020 to the bidding deadline (based on the contract signing time), bidders must have at least one contract performance in advertising design or printing. Bidders must provide scanned copies of the contract that can prove the performance requirements of this bidding. The scanned copies of the contract must include at least: the stamped pages of both the buyer and seller, the date of contract signing, and key information pages in the performance requirements. 【4】 Credit requirements:/[5] Qualification requirements for project leader:/[6] Requirements for other key personnel:/[7] Equipment requirements:/[8] Other requirements: The project is set with a principle of limiting the scope. The same bidder in this project
View hidden content