浙江Tender Announcement for PLC and Frequency Converter Update Project of No.2 Unloader of Ningbo Zhoushan Port Co., Ltd. Beilun Ore Terminal Branch and Ninggang Branch

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Ningbo Zhoushan Port Co., Ltd. Beilun Ore Terminal Branch Ninggang Branch No.2 Unloader PLC and Frequency Converter Update Project Tender Announcement Ningbo Zhoushan Port Co., Ltd. Beilun Ore Terminal Branch is conducting an open tender for the PLC and frequency converter update project of Ningbo Zhoushan Port Co., Ltd. Beilun Ore Terminal Branch Ninggang Branch No.2 Unloader. Qualified bidders are welcome to bid. 1、 Tender Number: KS-FW-2025-37 2. Procurement Method: Open Tender 3. Tender Content: Tender Content: PLC and Frequency Converter Update for Ship Unloader No.2 of Ninggang Branch. Please refer to the tender requirements for details. Delivery time: Within 120 days after the contract is signed, complete the preliminary preparation work for design and renovation and deliver the goods to the site. The construction period requires installation and commissioning to be completed within 30 days. After passing the special inspection by Ningbo Special Inspection Institute and passing the acceptance inspection by the bidding party, the "turnkey" construction shall be carried out. The specific construction date shall be arranged by the bidding party. Bidding control price (including tax): 1.98 million yuan. Bidders' bid prices shall not exceed the control price, and bids exceeding the control price will be treated as invalid bids. 4、 Qualification requirements for qualified bidders: 1. Ability to independently assume civil liability; Having a good business reputation and a sound financial accounting system; Having the necessary ability to fulfill the contract; Suppliers with independent legal personality, possessing all legal documents for bidding goods, and holding a business license issued by the industrial and commercial management department. 2. Provide the authorization letter issued by the manufacturer of the main equipment (PLC, driver) selected for this bidding for this project. 3. Possess a valid special equipment installation, renovation, and maintenance license (type includes: bridge crane; construction category: installation, repair, renovation; level: A) or the "Special Equipment Production License of the People's Republic of China" allows for the manufacturing of lifting machinery (including installation and repair); Sub project: Bridge crane; Grade A; (The license scope covers the scope of this project). 4. Provide the design and commissioning performance of the electrical control or drive system modification of the ship unloader (the bidder or the system integrator of the bidding scheme shall have the performance of constructing or modifying no less than 3 sets of electrical control systems for ship unloaders with a capacity of 1000T/H or above since January 1, 2020, and shall provide written supporting materials such as contracts, authorization letters from the system integrator of the bidding scheme, and the time shall be subject to the signing time of the contract). 5. Bidders shall not be dishonest persons subject to enforcement. The bidding agent shall search for the bidder's dishonest information (specific information shall be based on the "Credit China" website www.creditchina. gov.cn on the day of bid opening). If the bidder is a dishonest debtor, their bid will be rejected. If on the day of the bid opening, due to force majeure events, it is impossible to query and temporarily cannot be restored, a post query should be conducted on the winning bidder candidate during the public announcement period. If the winning bidder candidate is a dishonest debtor, their qualification as a winning bidder candidate will be cancelled. 6. This project does not accept consortium bidding and will undergo post qualification review; This project does not allow subcontracting, and subcontracting is not allowed without the consent of the tenderer. 5、 Acquisition of bidding documents: 1. This project adopts electronic bidding method, and bidders can access the electronic bidding procurement of Zhejiang Haigang Group
View hidden content