河北Tender Notice for Procurement and Installation of Windows for the First Plot of Xigangtou Urban Village Renovation (Provisional Estimate)

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Bidding Announcement for the Procurement and Installation of Windows on the First Site of Xigangtou Urban Village Renovation (Provisional Estimate) I. Bidding Conditions: The bidder for the procurement and installation of windows on the first site of Xigangtou Urban Village Renovation (Provisional Estimate) is Shijiazhuang Langyun Real Estate Development Co., Ltd; Shijiazhuang Housing and Urban Rural Development Group Construction Engineering Co., Ltd., the bidding project funds come from special loans, with a contribution ratio of 100%. The project has met the bidding conditions and is now open for bidding for window procurement. 2、 Project Overview and Bidding Scope 2.1 Project Overview: (1) Project Name: Procurement and Installation of Windows for the First Plot of Xigangtou Urban Village Renovation (Provisional Estimate). (2) Construction address: The first plot of Xigangtou Chengzhong Village renovation is located north of Zhengang Road, east of Beidu Street, west of Longgang Community, and south of Xigangtou Road in Qiaoxi District, Shijiazhuang City, Hebei Province. (3) Delivery location: North of Zhengang Road, east of Beidu Street, west of Longgang Community, south of Xigangtou Road, Qiaoxi District, Shijiazhuang City, Hebei Province, at the first site of Xigangtou Urban Village Renovation (designated by the user's construction site). (4) Construction scale: The total construction area of the first plot project for the renovation of Xigangtou Chengzhong Village is 123685.12 square meters, with an underground area of 42394.3 square meters. For the procurement and installation of windows in this project, please refer to the bidding documents for specific technical requirements. (5) Delivery and installation schedule: After the contract is signed, the window frame installation shall be completed within 30 calendar days from the date of receiving the notice from the tenderer; The installation of glass, opening fan and gauze fan shall be completed within 30 calendar days from the date of receiving the notice from the tenderer. Service period: From the date of contract signing to the end of the warranty period specified in the contract. (6) Quality standards: Qualified, in accordance with the requirements of relevant national and local regulations and standards, and meeting all the requirements of the drawing design and the tenderer. (7) Section division: This project is divided into one section. 2.2 Scope of Tender: All construction contents included in the design drawings and bill of quantities for window engineering, including but not limited to the secondary optimization design of bridge cut aluminum alloy windows (including screen fans) within the scope of the construction drawings, the purchase, processing, assembly, packaging, transportation, loading and unloading of raw materials such as profiles, hardware, glass, and screen windows, on-site material storage, installation (including frame seam filling, glue waterproofing treatment), provision and installation of manual and electric opening devices (if any), inspection coordination, acceptance and maintenance, finished product protection, and after-sales service. Please refer to Chapter 5 "Supply Requirements" for details. 3、 3.1 Qualification Requirements for Bidders 3.1 The qualification requirements for bidders in this bidding are as follows: 3.1.1 Qualification Requirements: Manufacturers or agents with legal personality and corresponding product production capacity, as well as corresponding capabilities in personnel, technology, funds, etc. 3.1.2 Credit requirement: Failure to be included in the list of dishonest executed persons on the "Credit China" website (www.creditchina. gov.cn) will result in invalid bidding (the results of the "Credit China" website query on the day of bid opening shall prevail). 3.1.3 Other requirements: If the legal representative or unit leader is the same person or if there is a controlling or management relationship between different units, they shall not participate in the bidding of this project at the same time. No
View hidden content