陕西Tender Announcement for Soil and Water Conservation Control Project in Meipo Small Watershed, Zhenba County

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

1. Bidding conditions: The Meipo Small Watershed Soil and Water Conservation and Treatment Project in Zhenba County has been approved for construction by the Zhenba County Development and Reform Bureau under the document No. 58 of the Zhenba County Development and Reform Commission. The construction funds are sourced from the Central Water Resources Development Fund in 2025. The bidder is the Zhenba County Soil and Water Conservation Work Station, and the bidding agency is Shaanxi Jianhua Engineering Project Management Co., Ltd. The project has met the bidding conditions and is now open for bidding for the construction and supervision of the project. 2. Project Overview and Bidding Scope 2.1 Construction Location: Located in Meipo Village, Chianan Town. 2.2 Project scale: mainly includes three parts: engineering measures, forest and grass measures, and ecological restoration measures, among which: (1) engineering measures. Including the construction of 11.60 hectares of stone terraced fields, 5 valley houses, 800 meters of drainage and irrigation ditches, 500 meters of land protection embankments, and 1000 meters of field roads. (2) Forest and grass measures. 26.40 hectares of sloping farmland will be converted into economic forests, 27.80 hectares of sloping farmland will be converted into ecological forests, and 204.20 hectares of barren hills will be converted into ecological forests. (3) Ecological restoration covers 5.90 square kilometers. Including 8 maintenance signs, 4 maintenance personnel, and 117000 trees replanted in sparse forests. 2.3 The estimated cost for this bidding project is 3.65 million yuan. 2.4 The planned construction period is 300 calendar days. 2.5 Section division: This project is divided into 3 construction sections and 1 supervision section. Section Name: Construction Section 1 of Meipo Small Watershed Soil and Water Conservation and Treatment Project in Zhenba County; Lot number: E61070035414jck5hf7001; Section type: Construction. Section Name: Construction Section 2 of Meipo Small Watershed Soil and Water Conservation and Treatment Project in Zhenba County; Lot number: E61070035414jck5hf7002; Section type: Construction. Section Name: Construction Section 3 of Meipo Small Watershed Soil and Water Conservation and Treatment Project in Zhenba County; Lot number: E61070035414jck5hf7003; Section type: Construction. Section Name: Supervision Section of Soil and Water Conservation and Treatment Project in Meipo Small Watershed, Zhenba County; Lot number: E61070035414jck5hf7004; Section type: Supervision. 2.6 Bidding Scope: Section Name: Construction of Soil and Water Conservation and Treatment Project in Meipo Small Watershed, Zhenba County. Section 1: Mainly includes three parts: engineering measures, forest and grass measures, and ecological restoration measures, among which: (1) engineering measures. Including the construction of 3.12 hectares of terraced fields, 2 valleys, 340 meters of irrigation and drainage channels, 130 meters of protective embankments, and 535 meters of field roads. (2) Forest and grass measures. 8.8 hectares of sloping farmland are used for economic forests and 77.33 hectares for ecological forests. (3) Ecological restoration covers an area of 1.97 square kilometers. Including 2 maintenance signs, 1 maintenance personnel, and 39000 sparse forest replants. (For specific details, please refer to the construction drawings and bill of quantities). Section Name: Construction of Soil and Water Conservation and Treatment Project in Meipo Small Watershed, Zhenba County Section 2: mainly includes three parts: engineering measures, forest and grass measures, and ecological restoration measures, among which: (1) engineering measures. Including the construction of 2.7 hectares of stone terraced fields, 2 valley houses, 130 meters of drainage and irrigation channels, 240 meters of land protection embankments, and farmland
View hidden content