新疆Construction Project of Anmin Road in Kuche Area of Kusha Xinbai Economic and Technological Development Zone (EPC General Contracting Section 1)
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
[Xinjiang Production and Construction Corps · First Division] [Public Bidding] [Design] Construction Project of Anmin Road in Kuche Area of Kusha Xinbai Economic and Technological Development Zone (EPC General Contracting Section 1) Information Source: First Division Release Time: June 19, 2025 I want to print the bidding announcement for Anmin Road Construction Project in Kuche Area of Kusha Xinbai Economic and Technological Development Zone (EPC General Contracting Section 1) I. Bidding Conditions: The Anmin Road Construction Project in Kuche Area of Kusha Xinbai Economic and Technological Development Zone (Bidding Project Number: E6601004002250409) has been approved for construction by the Development and Reform Committee of the First Division of Xinjiang Production and Construction Corps with the approval of Shishi Development and Reform Commission [2025] No. 131. The project funding source is the government, and the bidder is the military. Integrated development of Kusha Xinbai Industrial Park town and ecological protection center. The project has met the bidding conditions and is now open for bidding. 2、 Project Overview and Bidding Scope: 1. Implementation Area of the Bidding Project: Xinjiang Production and Construction Corps 1st Division. 2. Construction Site of the Bidding Project: Kuche Area, Kusha Xinbai Economic and Technological Development Zone. 3. Project Scale: Newly built 2084 meters of roads, urban secondary roads, road red line width of 36 meters, and ancillary supporting facilities. 4. This announcement is divided into one section, section number, section name, bidding scope, supply period (days) E6601004002250409001001, construction project of Anmin Road in Kuche area of Kusha Xinbai Economic and Technological Development Zone (EPC general contracting section 1), Anmin Road, starting from the planned Airport Avenue in the south and ending at the under construction Industry Avenue in the north, with a total length of 2084m, a red line width of 36m, a road grade of urban secondary road, two-way four lane, and a design speed of 40km/h. This project is a new construction project, which includes road engineering and road ancillary engineering, power engineering, water supply engineering, drainage engineering, reclaimed water engineering, seedling irrigation engineering, weak current civil engineering drainage engineering, etc. This includes but is not limited to the construction drawing design, procurement of equipment and installation and commissioning, construction and completion delivery, defect liability period work, and final acceptance of all work required by the country for this project, and is fully responsible for the quality, safety, civilized construction, environmental protection, construction period, and cost of the project. It is a turnkey project, and the specific content is as follows: the design work includes construction drawing design (including the main body and related ancillary projects, etc.), design disclosure, construction and acceptance coordination, and design changes. The above content has passed the review, drawing review, etc., and the final result document has been submitted. The construction scope includes all construction work within the EPC general contracting scope of this project and all construction work during the defect liability period. The scope of procurement includes the procurement, transportation, installation, acceptance and storage of all building materials and equipment related to the engineering project (as specified in the construction drawings). 260 III. Qualification Requirements for Bidders: 3.1 Bidders must possess the first level (inclusive) or above qualification for general contracting of municipal public works construction issued by the competent construction administrative department, and have a valid safety production license. They must also possess the comprehensive first level qualification for engineering design or the second level or above qualification for engineering design in the municipal industry or the second level or above qualification for professional design in the municipal industry (road engineering). 3.2 This item