安徽Announcement on the transaction of replacing some street lights and installing new road signs at the intersection of Leichi West Road and Planning Second Road

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Anqing Wanyi Project Consulting Management Co., Ltd. is commissioned by the Anqing Economic and Technological Development Zone Financial Investment Construction Engineering Management Center to announce the replacement of some street lamps and the installation of new road nameplates at the intersection of Leichi West Road and Planning Second Road. Suppliers from Anqing's independent trading platform are welcome to participate. 1、 Project Name and Content: 1. Project Number: H0QT25Z1403322. Project Name: Replacement of Street Lights and Installation of Road Signs at the Intersection of Leichi West Road and Planning Second Road. 3. Project Location: Anqing City. 4. Maximum Bid Price: 13869.86 yuan. Please refer to the attached maximum bidding price limit for details. 5. Transaction contract price (fixed quotation): 11789.38 yuan. 6. Project content: This project is located at the intersection of Leichi West Road and Planning Second Road in Anqing Economic Development Zone. The main construction content includes the removal of 2 sets of 10m high street lamps, replacement with 7m high street lamps, installation of 3 new sets of nameplates, and related supporting construction content. Please refer to the construction drawing design documents and bill of quantities for details. 7. Planned construction period: 20 calendar days. 2. Qualifications and qualification requirements: 1. Participating suppliers must have a professional contracting qualification of Level 3 or above for urban and road lighting engineering issued by the competent department of housing and urban-rural development. 2. The proposed project manager must meet the following requirements simultaneously: ① Possess a second level or above registered construction engineer qualification in mechanical and electrical engineering; ② Obtain the B certificate of safety production assessment issued by the construction administrative department; ③ On the day of the transaction, I did not serve as a project manager in any other project, or although I held a project manager position in any other project, I promised to be able to change from another project to this project and fully fulfill my obligations before the contract is signed after the completion of this project. 3、 Trading Time, Location, and Rules 1. Trading Time: 16:00 on June 24, 2025 2. Trading Location: Anqing Public Resource Trading Center 3. Participating Website: Anqing Public Resource Trading System( http://220.179.5.14:90/TPBidder/memberLogin )4. Transaction Rules: Fixed Price Extraction Method 4. Precautions 1. Prior to the release of the transaction announcement information for this project, the supplier has signed the "Anqing Online Mall Small Project Supplier Contract" or the "Anqing Autonomous Trading Platform Supplier Contract". 2. The proposed suppliers for this project are required to log in to the Anqing Public Resource Trading System before the trading deadline( http://220.179.5.14:90/TPBidder/memberLogin )”Click on 'I want to participate' for the project, fill in the relevant information, and click on 'Online Sign in' to default to the supplier's quote (as a fixed quote) and participate in the project transaction. 3. Suppliers who intend to participate in this project can click "I want to withdraw" to modify the information already filled in (such as project leader, etc.) before the deadline of the transaction, but cannot modify it after the deadline of the transaction. The relevant information of the supplier shall be based on the final information provided by the supplier before the deadline of the transaction. 4. The participating suppliers in this project do not need to arrive at the transaction location. The project unit or agency shall pass through the transaction location at the end of the trading time“
View hidden content