陕西Fuyan School Supporting Project Design Services
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
1. Bidding conditions: The design services for the supporting project of Fuyan School in this bidding project have been approved for construction by the Economic Development Bureau of Fuyan Industrial Cooperation Park Management Committee with the approval of 2505-610583-04-01-823494. The bidder (project owner) is Shaanxi Fuyan Education Technology Co., Ltd. The construction funds are self raised, and the project contribution ratio is 100.00% of self raised funds. The project has met the bidding conditions and is now open for bidding. Potential bidders (hereinafter referred to as applicants) who are interested are invited to submit pre qualification applications. 2. Project Overview and Bidding Scope 2.1 Construction Location: Plot 1 is located in Fuyan Industrial Cooperation Park, east of Tai'an Road, south of Fuchen 7th Road, and north of Fuchen 8th Road. Plot 2 is located in the Fuyan Industrial Cooperation Park, east of Shufeng Road, south of Fuchen 7th Road, and north of Fuchen 8th Road.; 2.2 Project Scale: The supporting project of Fuyan School covers an area of 39.12 acres, with a total construction area of approximately 58578.36 square meters. The project includes two plots of land: apartment dormitories and student canteens. Among them, the total land area of the apartment dormitory plot is about 22135.00 square meters, and the total construction area is about 54785.49 square meters (the total above ground construction area is 49175.89 square meters, and the underground construction area is 5609.60 square meters), mainly for the construction of four individual buildings including high school dormitory building, junior high school dormitory building, 1 # apartment building, 2 # apartment building, and ancillary facilities such as basements. The total land area of the student canteen plot is approximately 3944.68 square meters, with a total construction area of approximately 3792.87 square meters. The plot is for the construction of the student canteen; 2.3 Total project investment: 428878400 yuan (including an estimated 2188900 yuan for this bidding project); 2.4 Planned construction period: 785 calendar days; 2.5 Section Division: Section 1: Section Name: Fuyan School Supporting Project Design Services; Lot number: E6100003501ss6aakqv001; Section type: Design;; 2.6 Bidding Scope: Section 1: Design the supporting project of Fuyan School, including scheme design and construction drawing design work; 2.7 Other:. 3. Applicant Qualification Requirements 3.1 Section Name: Fuyan School Supporting Project Design Services: This pre qualification requires the applicant to have a comprehensive engineering design qualification of Grade A or above, or a design qualification of Grade A or above in the construction industry, or a professional design qualification of Grade A or above in the construction industry (construction engineering), and to have corresponding design capabilities in personnel, equipment, funds, and other aspects. Among them, the bidder intends to appoint a project leader who has the qualification of a first level registered architect or above, and has not served as the project leader of any other ongoing construction projects.. 3.2 Section Name: Fuyan School Supporting Project Design Service: This pre qualification review accepts joint venture pre qualification applications. For the application for pre qualification of a consortium, the following requirements shall be met: if the consortium submits a pre qualification application, the number of members forming the consortium shall not exceed two. If the pre qualification application of the consortium requires the identification of the leading unit, the leading unit of the consortium shall represent all parties in the consortium to handle all affairs during the bidding process of this project, and the consortium shall meet the qualification review requirements