陕西Pre Qualification Announcement for EPC of DK7 Resettlement Construction Project in Dahua District

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

1. Bidding conditions: The EPC (Engineering, Procurement, and Construction) of the DK7 Housing and Resettlement Construction Project in Dahua District has been approved for construction by the Development and Reform Bureau of Qujiang New Area with the approval of 2506-610, 168-04-01-600448. The project owner is Xi'an Qujiang Daming Palace Construction and Development Co., Ltd. The project funds come from a state-owned holding project, and the project contribution ratio is 100.00% of state-owned funds. The bidder is Xi'an Qujiang Daming Palace Construction and Development Co., Ltd., and the bidding agency is Shaanxi Provincial Procurement and Tendering Co., Ltd. The project has met the bidding conditions and is now open for bidding. 2. Project Overview 2.1 Project Scale: The plot ratio is proposed to be 3.0, with a total construction area of approximately 204500 square meters, including approximately 143100 square meters above ground and 61400 square meters underground. The construction content includes residential, supporting public buildings, and commercial areas (the final construction scale is subject to planning approval); 2.2 Project Location: South of Liuheyao Road, north of Shachang South Street, west of No.1 Planning Road and east of Jianhua Road, with a land area of approximately 71.55 acres (plot number QJ11-5-100).; 2.3 Total project investment: 1072000000 yuan; 2.4 Section Division: Section Name: DK7 Housing and Resettlement Construction Project EPC in Dahua District; Lot number: E6101133506b6qMRSXIs001; Section type: Engineering general contracting; 2.5 Bidding Scope: Section Name: EPC (Engineering, Procurement, and Construction) of DK7 Housing and Resettlement Construction Project in Dahua District, including all design contents and construction of the project, including scheme design, construction drawing design, etc., until the completion acceptance and overall handover, defect repair and warranty work during the engineering warranty period. Please refer to the bidding documents and design task book for details. The total investment amount for the general contracting of this project is approximately 805.8809 million yuan.; 2.6 Other: The planned construction period is 780 calendar days.. 3. Qualification Requirements for Applicants 3.1 Section Name: DK7 Housing and Resettlement Construction Project EPC in Dahua District. This pre qualification review requires applicants to have a comprehensive qualification of Class A for engineering design and above, or Class A for engineering design and above, or Class A for construction engineering and above, or Class A for construction engineering and above, and corresponding qualifications in personnel, equipment, funds, etc. Among them, the bidder intends to appoint a project manager with the qualification of Registered Constructor Level 1 or above, or Registered Architect Level 1 or above. (Note: The applicant intends to appoint the general contracting project manager and the design or construction project leader as the same person, but they must meet their qualification requirements at the same time). 3.2 Section Name: EPC (Engineering, Procurement, and Construction) of DK7 Housing and Resettlement Construction Project in Dahua District. This qualification pre-approval is open to joint venture qualification pre-approval applications. If applying for pre qualification of a consortium, the following requirements should be met:
View hidden content