陕西Ankang High tech Zone Intelligent Terminal Industrial Park Phase III Project

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

1. Bidding conditions: The third phase of the Ankang High tech Zone Intelligent Terminal Industrial Park project has been approved for construction by the Ankang High tech Zone Economic Development Science and Technology Bureau with the approval of Ankang High tech Economic and Technological Development [2025] No. 46. The bidder (project owner) is Ankang New Economic Industrial Park Development and Construction Co., Ltd. The construction funds are self raised, and the project contribution ratio is 100.00% of self raised funds. The project has met the bidding conditions and is now open for bidding. Potential bidders (hereinafter referred to as applicants) who are interested are invited to submit pre qualification applications. 2. Project Overview and Bidding Scope 2.1 Construction Location: The project is located at Min'an Road in the east, Minzhu Road in the west, Chuangxin Road in the south, and Xingye Road in the north.; 2.2 Project Scale: The total land area of the project is 169263.70m, approximately 253.896 acres, with a total construction area of 416000m. The above ground building area is 398000 square meters; The underground building area is 18000m. The main construction includes large flat level electronic processing plants and park service buildings, as well as supporting infrastructure projects such as park roads, water supply and drainage, power supply, and lighting; 2.3 Total project investment: 1974939000 yuan (including an estimated 1684438578.3 yuan for this bidding project); 2.4 Planned construction period: 900 calendar days; 2.5 Section Division: Section 1: Section Name: EPC General Contracting for Phase III of Ankang High tech Zone Intelligent Terminal Industrial Park Project; Section number: E6109003546kc11xq0vn001; Section type: EPC; Section 2: Section Name: Engineering Supervision of Ankang High tech Zone Intelligent Terminal Industrial Park Phase III Project; Section number: E6109003546kc11xq0vn002; Section type: Supervision;; 2.6 Bidding Scope: Section 1: Bidding Scope: Section Name: Ankang High tech Zone Intelligent Terminal Industrial Park Phase III Project; Complete the construction drawing design and general contracting work of this project until the completion acceptance, filing, and handover of the project, prepare and complete the settlement, cooperate with the construction unit to complete the final settlement, engineering warranty, and other work. The specific content includes but is not limited to the following: 1. Design scope: review the preliminary design data provided by the tenderer in the early stage of construction, and propose supplements and improvements; The construction drawing design of the preliminary design and construction scope within the red line of the land, as well as the special designs related to landscape, outdoor foundation support, civil defense, fire protection, lighting, prefabricated, intelligent, security, BIM, etc. related to the project, including design guidance, technical services and cooperation during the construction process, and all the contents that need to be expressed in the drawings encountered by the employer during the actual implementation of the project, shall be completed by the design party; 2. Construction scope: The construction content includes but is not limited to all engineering construction and site leveling, support engineering, water, electricity, gas, communication access engineering, pipeline relocation, equipment and material procurement and installation, commissioning, etc. specified in the above design scope; 3. Except for the above provisions, any other unclear content shall be subject to the preliminary design drawings, bidding documents, and corresponding information provided by the employer; Section 2: Ankang High tech Zone Intelligent Terminal Industrial Park Phase III Project E
View hidden content