河北Preliminary Design Tender Announcement for Handan National Logistics Hub Logistics Distribution Center Project

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Preliminary Design Bidding Announcement for Handan National Logistics Hub Logistics Distribution Center Project 1. Bidding Conditions: The preliminary design of the Handan National Logistics Hub Logistics Distribution Center project has been approved for construction by the Administrative Approval Bureau of Handan Jinan New Area with the approval number of Han Jinan New Area Approval Approval Letter [2024] 72. The project owner is the Economic Development Bureau of Handan Jinan New Area, and the construction funds will come from seeking higher-level funds and local financial support. The investment ratio is 100%, and the bidder is the Economic Development Bureau of Handan Jinan New Area. The project has met the bidding conditions and is now open for bidding for its design. 2. Project Overview and Bidding Scope 2.1 Project Overview: 2.1 The total design investment of this project is 7.559 million yuan; Construction scale: The project covers an area of approximately 100 acres, with a logistics trading market of 29000 square meters, a multimodal transportation transfer station and cargo yard of 12000 square meters, a cold chain distribution center of 25000 square meters, a sorting warehouse of 6000 square meters, a logistics transfer area of 5000 square meters, and related transfer facilities and equipment, site leveling, and supporting infrastructure such as outdoor water supply and drainage, power supply, roads, parking lots, charging piles, etc. Building function: In addition to improving some of the infrastructure in the first phase of the hub project, this project aims to enhance its infrastructure capabilities by equipping multimodal transport stations, logistics trading markets, sorting and distribution facilities, with a focus on laying out functional logistics facilities. 2.2 Bidding Scope: Complete the project proposal and preliminary design (including budget preparation), and cooperate in completing relevant approval and construction procedures. The maximum bidding price for this tender is 3.024 million yuan. 2.3 Service period: 30 calendar days from the written confirmation of the design unit (team) by the tenderer. 2.4 Other: Quality standards: comply with current national design specifications, and the design depth meets industry standards. 3. Qualification Requirements for Bidders 3.1 The qualification requirements for bidders in this bidding are as follows:; 3.1.2 Qualification requirements for project leader: Possess the qualification of first level registered architect and registered engineer, with the registered unit and the bidder's name consistent; 3.1.3 Other requirements: 1. The bidder and the proposed design leader have not been included in the list of dishonest persons subject to enforcement (based on the information published and queried on the "Credit China website, National Court List of Dishonest Persons Subject to Enforcement" platform); 2. ① This bidding will implement post qualification review. Bidders who fail the post qualification review will have their bids rejected. Specific requirements can be found in the bidding documents. ② The same person in charge of the unit or different units with controlling or management relationships shall not participate in the bidding of this bidding project at the same time. 3.2 This bidding does not accept consortium bidding. 4. Economic compensation for technological achievements: This bidding does not provide economic compensation for the technological achievements in the bidding documents of unsuccessful bidders. If economic compensation is given, the tenderer will pay an economic compensation fee of 0 yuan according to the following standards. 5. Obtaining the bidding documents 5.1 For those interested in participating in the bidding process, please submit it between June 2, 2025, 00:00 and 2025-
View hidden content