北京Inner Mongolia Company Shangwan Thermal Power Plant Dispatch Double Plane 2M Line Lease and Maintenance Project Inquiry and Procurement
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
Headline: Inquiry Form from Guoneng Materials Inner Mongolia Co., Ltd. on April 15, 2025 at 8:42:54. Initiate Consultation/Objection/Complaint for an item. Project Name: Inner Mongolia Shangwan Thermal Power Plant Dispatch Double Plane 2M Line Lease and Maintenance Project Inquiry and Procurement Agency: Guoneng Materials Inner Mongolia Co., Ltd. Procurement Number: WZNM-FWXJ-2025040553 Purchaser: Beijing Guodian Electric Power Co., Ltd. Shangwan Thermal Power Plant Bidder Qualification Requirements: The bidder must also meet the following qualification certificates: 1. Construction Enterprise Qualification Certificate - Communication Engineering Construction General Contracting - Level 3. Performance requirements of the bidder: The bidder must meet one of the following performance requirements: 1. The bidder must provide at least one maintenance contract for the communication system of the power plant or substation in the past three years (from January 1, 2022 to the deadline for quotation). The bidder must provide a scanned copy of the performance contract that meets the requirements of this procurement, which must include the procurement scope, contract signing time, and the stamped pages of both parties. Performance proof documents not provided according to the above requirements are invalid proof documents. Procurement Method: Inquiry Procurement Inquiry Method: Public Inquiry Material Classification: Service Category - Production Services; Service category - comprehensive services; Service category - survey and design; Service category - technical consulting services; Service category - supervision services; Service category - Other; Service category - supervision; Service category - labor services; Main technical requirements: The leasing and maintenance project for the double plane 2M transmission line of Shangwan Thermal Power Plant includes: 1. Maintenance of the dispatch data network, dispatch management network, and OMS system; 2. Maintenance of remote control four line channel; 3. Maintenance of metering small channel; 4. Dispatch telephone maintenance; 5. Maintenance and testing of 2M channel for user to ground adjustment; 6. The user goes to the 2M channel of middle note for maintenance and detection; 7. Dedicated channel for line protection; 8. Communication with the main measurement station; 9. Regular inspection of data network equipment network management; 10. Regular inspection of optical communication equipment network management; 11. Regularly backup scheduling system data; 12. Maintenance of network security detection system, please refer to the two items in the technical section. Publisher: Wu Xifeng. Quotation method: Full order contact phone number: Release time: 2022-04-1508:42:54. Quotation deadline: 2022-04-18:00 9:00:00. Payment method: Telegraphic transfer. Freight acceptance: Supplier to bear. Objection contact person: Guoneng Materials Inner Mongolia Co., Ltd. Attachment: Objection receiving unit: Guoneng Materials Inner Mongolia Co., Ltd. Remarks: ☆ Special reminder ☆: 1. Log in to the supplier's own account (www.neep.shop), click on "My e-procurement", search for the project in the "Announcement", and click on "I want to participate" to see the contact information of the purchasing unit's materials and technical personnel; 2. Please download and carefully read the business, technical, and attachment files; 3. Before quoting, it is necessary to carefully verify the requirements of the inquiry/procurement documents (specifications, models, quantities, drawings, materials, brand manufacturers, scope, etc.), and strictly quote according to the requirements; 4. The transaction service fee is included in the total quotation but not separately listed. After selection, the service fee will be charged according to the transaction amount (transaction service fee=transaction amount * service fee rate), and the transaction supplier will receive payment through the payment platform