湖北S119 (Putuan Xiaogang Miaoling Wuyi) Reconstruction Project EPC Project

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Project Number: 42070320250618001 Project Name: S119 (Putuan Xiaogang Miaoling Wuyi) Renovation Project EPC Project Bidding Registration Number: 42070320250618001 Bidding Project Name: S119 (Putuan Xiaogang Miaoling Wuyi) Renovation Project EPC Project administrative division: Huarong District Tenderer (seal): Huarong District Transportation Bureau, Ezhou City Tenderer's legal representative (seal): Wang Xinguo Tendering agency: Hubei Xiangyun Engineering Consulting Co., Ltd. Tenderer contact person: Zhao Bo Tendering contact phone number: 18658000237 Tenderer agent contact person: Xu Xiaoxiao Tendering agent contact phone number: 13308683381 Electronic bid: Electronic bid Project location: Huarong District, Ezhou City, Hubei Province Tendering category: Engineering general contracting Tendering content: Design, procurement, construction/turnkey engineering general contracting Tendering method: Public bidding Tendering content description: 2.1 Project overview: This project is located in Huarong District, Ezhou City, Hubei Province. The total mileage of the project is 4.918km. The starting point of the line is located in Wudang Street, Miaoling, Huarong District, with the starting stake number of K0+000. It connects with the existing S119 at the intersection of Exian Expressway and Shihugang, with the ending stake number of K4+918. The design speed is 60km/h, two-way six lane, first-class highway standard, and the subgrade width of the general road section is 31m. A new Zhanzuigang Bridge is built, with 9 culverts, including 5 circular pipe culverts and 4 slab culverts. The project includes temporary works, subgrade works, pavement works, bridge and culvert works and other works first-class highway standards. The total investment of the project is 423229600 yuan, including 294778100 yuan of engineering costs, 108297700 yuan of other engineering construction costs, and 20153800 yuan of reserve funds. The funding comes from government investment and other sources. 2.2 Bidding scope: including but not limited to the following aspects: ① Design content includes: preliminary design optimization of the project (if any), construction drawing design, red line drawing, land acquisition and demolition drawing, budget document preparation, construction technical specifications, bill of quantities and corresponding cost analysis, special construction plans and safety measures for the demolition of large temporary buildings and important structures, safety verification, etc; All other work specified in the design document preparation method issued by the industry management department; Design services during project implementation and cooperation with the tenderer for scientific research projects, project evaluations, award applications, and other related work. ② The construction content includes the implementation, completion, and defect repair of all construction contents within the scope of the section, including temporary works, roadbed works, pavement works, bridge and culvert works, intersection works, traffic works and facilities along the line, greening and environmental protection works, and other works. ③ The tenderer of this bidding project has entrusted the design unit to complete the preliminary design. Bidders shall receive preliminary design materials in accordance with the contract provisions and optimize the preliminary design (if any), submit construction drawing design documents, and then modify and improve them according to the review comments. Bidders shall be responsible for the quality of the submitted design documents and intermediate results. The construction drawing design shall be reviewed by the preliminary design unit and the tenderer and submitted to the relevant competent department for approval. After the approval of the construction drawing design, the contractor is allowed to carry out the construction according to the actual situation
View hidden content