北京Announcement of Batch Evaluation Results for the Multi energy Complementary Unit 1 Operation Flexibility Improvement and Renovation Project (Boiler Side) of Xinjiang Huadian Midong Thermal Power Co., Ltd

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Notice of Bid Winning Candidates for the Multi Energy Complementary Unit 1 Operation Flexibility Improvement and Renovation Project (Boiler Side) of Xinjiang Huadian Midong Thermal Power Co., Ltd.&# xa0; Announcement End Time: June 19, 2025 I. Evaluation of Bid Winning Candidates [Circulating Fluidized Bed Boiler Multi Energy Complementary Unit 1 Operation Flexibility Improvement Project (Boiler Side)] 1. Basic Information, Qualification and Performance of Bid Winning Candidates and Their Project Leaders (if any) (1) Bidder Name: Harbin Boshen Technology Development Co., Ltd., ranked 1; (2) Bid price: 11.77 million yuan, quality: meets the requirements of the bidding documents, construction period/delivery period/service period: meets the requirements of the bidding documents; (3) Qualification Certificate Name: General Contracting Qualification for Power Engineering Construction, Level: Level 2, Certificate Number: D223325428, Expiration Date: June 19, 2029; Qualification Certificate Name: Safety Production License, Level: None, Certificate Number: (Black) JZ Safety License Letter [2014] 005201, Expiration Date: September 5, 2026; (4) 1 effective performance item, the performance situation that meets the qualification requirements for performance quantity is as follows: 1) Project name: Huadian (Zhangping) Energy Co., Ltd. No.6 Boiler Low Nitrogen Combustion Transformation Contract (300MW Fluidized Bed Unit, including flue gas recirculation transformation and air distribution plate transformation), put into operation on August 10, 2024, counterparty name: Huadian (Zhangping) Energy Co., Ltd; (5) Name of project leader: The bidding announcement and compliance review of this project do not require the project leader; 2. Basic information, qualifications, and performance of the winning bidder candidate and their project leader (if any) (1) Bidder name: Xi'an Huadian Clean Energy Technology Co., Ltd., ranked 2; (2) Bid price: 11.4861 billion yuan, quality: meets the requirements of the bidding documents, construction period/delivery period/service period: meets the requirements of the bidding documents; (3) Qualification Certificate Name: General Contracting Qualification for Power Engineering Construction, Level: Level 2, Certificate Number: D361060676, Expiration Date: July 22, 2025; Qualification certificate name: Safety Production License, level: None, certificate number: (Shaanxi) JZ Safety License Letter [2023] 012123, expiration date: February 8, 2027;   (4) 1 effective performance item, the performance situation that meets the qualification requirements for performance quantity is as follows: 1) Project name: Beijing Guodian Power Co., Ltd. Salazi Power Plant # 2 Unit Flexibility Transformation EPC Engineering Project Construction Contract (300MW Fluidized Bed Unit, including flue gas recirculation transformation and air distribution plate transformation), commissioning date: August 20, 2024, counterparty name: Shandong Zhongze Engineering Technology Co., Ltd; (5) Name of project leader: The bidding announcement and compliance review of this project do not require the project leader. 2、 If bidders or other interested parties have objections to the evaluation results of this bidding project, please raise them during the public announcement period of the winning bidder candidates. stem or root of plants
View hidden content