安徽Announcement of Public Bidding for Copper Crown Metallurgical Electric Heater

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Bid Number: WZGX-SBBJ-20251045G Bid Deadline: 2022-04-2009:00:00 Bid Content: Joint Stock Material Supply and Marketing Department Centralized Procurement - Copper Crown Metallurgical Electric Heater Public Bid Announcement Purchasing Unit Contact Person Hu Sulan Contact Information 0562-5860931 [Important Statement] 1. Public bidding is an open competitive procurement method adopted by Tongling Nonferrous Group to standardize procurement management and promote transparent operations. 2. The winning bid result will only be directly notified to the bidding winning bidder, and no separate announcement of the winning bid will be issued. Bidders who have objections to the winning bid result may submit a written objection to the bid acceptance person. 3. If a bidder breaches the contract during the bidding, signing, or performance process, it shall be dealt with in accordance with the relevant dishonest supplier management regulations of Tongling Nonferrous Group. 4. The consequences of being judged as invalid due to the bidding bidder's production and submission of quotation documents that do not meet the requirements, as well as the discovery of dishonest behavior by the bidding bidder, shall be borne by the bidding bidder themselves. 5. Bidders should carefully read the "Electronic Bidding Procurement Notice" (please click to view) before quoting. 1、 Bidding content, serial number, material description (name and model specifications), quality standards and technical requirements (including technical attachments), brand or manufacturer, unit quantity, delivery time, delivery location (user unit), note 1: Ceramic sleeve electric heater | YH-A; Rated voltage 380V; Rated power 1.0kW | | | | | Within 30 days after the contract comes into effect, the contact person of the copper crown smelting unit: Wu Xiang Contact information: 0562-5688325 Total (total price) 2. Relevant requirements, serial number, condition name, condition content 1. Qualification requirements for bidders: Bidders must be manufacturers with independent legal personality before the bid opening date. The bidder must have been established for no less than one year as of the bid opening date and have a registered capital of no less than RMB 1 million before the announcement is made. Bidders must upload supporting materials for the substantive qualification requirements before the bid opening date, otherwise they will be treated as invalid bids. For incomplete or ambiguous technical requirements, bidders should verify and confirm with the contact person of the user unit in a timely manner before quoting. The quotation requires a 13% value-added tax included. 3 delivery methods: Free delivery to the user unit. 4. Packaging and transportation requirements: The packaging is suitable for the transportation and loading/unloading of the bidding goods. Payment methods: All payments, except for the warranty deposit, shall be made by bank wire transfer in the second month after the month of invoice entry and other related procedures. Payment or advance payment required for the month of entry or the following month shall be treated as invalid. 6. Performance bond of 0 million yuan. (Within 5 working days after receiving the bid notification, pay in cash to the designated account) 7 Warranty Period and Guarantee Deposit The warranty period for the goods under this contract is 12 months from the date of use of the goods, and the warranty deposit is 0 yuan. After the warranty period expires, the buyer shall pay the seller based on the non objection report issued by the buyer's user unit. When bidding, the specifications, technical parameters, and quality technical standards of the products should be fully described. If there is a technical or commercial deviation from the bidding content, a deviation description should be provided during the bidding process. The bidding purchaser may adjust the bid price, but the adjusted bid price is only for comparison purposes, and the original bid price of the bidder remains unchanged. 9 Supply Scope
View hidden content