青海Section 19 of the Ecological Protection, Restoration, and Comprehensive Control of Soil and Water Loss Project in Hehuang District, Xining City, Qinghai Province in 2025

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

[Xining City · Municipal Level] [Public Bidding] [Construction] Bid Section 19 of 2025 Hehuang Area Ecological Protection and Restoration and Comprehensive Control of Water and Soil Loss Project in Xining City, Qinghai Province [Announced] [Information Time: 2025/04/1423:30:34] [Reading Times:] [I want to print] [Close] Chapter I Bidding Announcement 2025 Hehuang Area Ecological Protection and Restoration and Comprehensive Control of Water and Soil Loss Project in Xining City, Qinghai Province (Project Name) Bidding Announcement 1. Bidding Conditions This bidding project 2025 Hehuang Area Ecological Protection and Restoration and Comprehensive Control of Water and Soil Loss Project in Xining City, Qinghai Province has been approved by Xining Development and Reform Commission. The construction was approved in the regional [2022] No. 116 document. The project capital is from the super long term special treasury bond fund. The tenderee (project owner) is Xining Forestry Station. The project has met the bidding conditions and is now open for bidding for the construction of the project. 2. Project Overview and Bidding Scope Section 19 Construction Content: Restoration of Degraded Forests in Huangyuan County, 2803.00 acres 3. Qualification Requirements for Bidders 3.1 This bidding requires bidders to have independent legal personality and corresponding capabilities in personnel, funds, equipment, and other aspects. (Qualification requirements for bidders should be filled in. If there are requirements for ability and reputation, please fill in item 1.4.1 of the pre attached table of the bidder's instructions) 3.2 Joint bidding is not accepted in this bidding. 3.3 This bidding will implement post qualification review, and the specific requirements for qualification review can be found in the bidding documents. Bidders who fail the post qualification review will have their bids rejected. 3.4 This project consists of 22 specific sections, namely E6301000076056104001001 to E6301000076056104001022 (section names or numbers). Each bidder may bid for one (specific quantity) of the sections; A maximum of 1 (specific quantity) bidding section is allowed, please do not exceed the allowed number of bidding sections (applicable to bidding projects divided into sections). 4. 4.1 Acquisition of Bidding Documents: Potential bidders who intend to participate in the bidding for this project shall submit their bids on the Qinghai Province Electronic Tendering and Bidding Public Service Platform( http://www.qhdzzbfw.gov.cn )(hereinafter referred to as the "provincial platform") shall register for the "main body storage" of the integrity database, and apply for a CA digital certificate after completing the registration. For specific operations, please refer to the "Qinghai Province Public Resource Trading Platform CA Digital Certificate Processing Guide" in the service guide column of the "Qinghai Province Public Resource Trading Network" (www.qhggzyjy. gov.cn/). 4.2 The bidding documents (including all reference materials required for the preparation of this project) are an integral part of the bidding documents and must be uploaded to the Qinghai Province Electronic Tendering and Bidding Public Service Platform for publication. Acquisition method: From 0:00 on April 15, 2025 to 24:00 on April 21, 2025, potential bidders should download the CA digital certificate for free by clicking "I want to bid" through the "Qinghai Province Electronic Tendering and Bidding Public Service Platform". 4.3 The tenderer (agency) shall not require bidders to register or register on-site
View hidden content